NCHRP Synthesis 429 – Geotechnical Information Practices in Design-Build Projects

nchrp_syn_429_cover

Early this year, NCHRP released a synthesis report on geotechnical practices related to design-build projects.  I have had writing a blog post on this on my “to do” list for a few months and finally got down the list!

NCHRP Synthesis 429 – Geotechnical Information Practices in Design-Build Projects is a report on the current practices of allocating and managing geotechnical risk through the use (or lack of!) geotechnical information in transportation project bid documents.  Even though design-build as a delivery process for projects has been around for a while now, the allocation of risk due to subsurface conditions is an issue still treated with a variety of approaches. 

Those of us who have been in this industry for a while know that a thorough geotechnical investigation reduces both cost risk and construction/schedule risk.  Design-build is an effective method for accelerating project construction and delivery; however, the acceleration of the schedule puts more pressure on the geotechnical design since “geotechnical investigation and design is usually the first design package that must be completed and geotechnical uncertainty is usually high at the time of DB contract award.”

Because geotechnical investigation and design is usually the first design package that must be completed and geotechnical uncertainty is usually high at the time of DB contract award, the design-builder’s geotechnical designers are under pressure to complete their work and enable foundation and other subsurface construction to commence. Successfully managing the geotechnical risk in a DB project is imperative to achieving the requisite level of quality in the finished product. The purpose of this synthesis is to benchmark the state of the practice regarding the use of geotechnical information in DB solicitation documents and contracts. The high level federal encouragement through EDC for state DOTs to accelerate project delivery by using DB elevates the need to manage geotechnical risk while expediting geotechnical design to a critical project success factor, and makes the results of this synthesis both timely and valuable.

As is the case with NCHRP synthesis reports, the authors conducted a literature review, conducted a survey of state DOTs and other agencies, and developed some conclusions that include effective practices for managing geotechnical risk.

The synthesis was based on a comprehensive literature review; a survey of U.S. DOTs, which received responses from 42 states (response rate = 84%); a content analysis of DB solicitation documents from 26 states; a content analysis of DB policy documents/guidelines from 12 state DOTs and 5 federal agencies; and interviews of 11 DB contractors whose markets encompass more than 30 states. The synthesis also furnishes three legal case studies (Colorado, Illinois, and Virginia) on cogent geotechnical issues and four geotechnical engineering case studies (Hawaii, Minnesota, Missouri, and Montana) that illustrate the methods transportation agencies use to deal with geotechnical issues on DB projects. Conclusions were drawn from the intersection of independent sources of information from the survey, case studies, and literature.

Some of the effective practices highlighted include the use of confidential Alternative Technical Concepts (ATC) during pre-bid, explicit differing site conditions (DSC) clauses that clearly quantify the design-build team’s risk and the threshold above which the DOT assumes the risk, the use of qualified personnel, and timely review schedules for geotechnical design items early in the project.

Our (DBA) experience in design-build has seen the range from effective practices to poor practices.  This report provides a great summary of many of the effective practices we have found to be beneficial and that help reduce conflicts and delays.  We can’t completely eliminate geotechnical risk, but it can be effectively and equitably managed.

Click on the link below to get a copy from NCHRP.

NCHRP Synthesis 429 – Geotechnical Information Practices in Design-Build Projects

ENR’s Best of the Best 2012–Audubon Bridge

ENR Logo

 

The John James Audubon Bridge was recently selected as the Editor’s Choice/Transportation for ENR’s Best of the Best Projects for 2012.  The annual competition culminated in honoring ENR’s selection of the most outstanding construction projects in the U.s. And Puerto Rico complete between July 2011 and June 2012.

Nearly 1,000 project teams submitted their best work to ENR’s regional "Best Projects" competitions. For each of the nine regions, our editors assembled an independent panel of industry judges to home in on the winners in 19 categories. The winners of the regional contests moved on to the national competition. A different set of industry judges examined the projects to distinguish the "Best of the Best" in teamwork, success in overcoming challenges, innovation and quality. This year, a new award honors the safest project, judged by industry safety experts in both the regional and national competitions. Also, ENR’s editorial staff chose one special project as the "Editors’ Choice" to represent the pinnacle of design and construction excellence.

The Audubon Bridge won the Editor’s Choice – the editorial staff’s selection of the “pinnacle of design and construction excellence”.  Congratulations to everyone at Audubon Bridge Constructors (Flatiron, Granite and Parsons), Louisiana DOTD, and all who worked on the project!

Regular readers of our blog will be very familiar with the JJA as we often called it.   You can catch all of the geotechnical and foundation highlights on our project page, or check out previous posts.

Images from: ENR.com

“Geotechnical Monument” in St. Louis

DSC_0719

 

It may not have been intended as such, but we will “claim” this large rock core on the Mississippi River as a “geotechnical monument”.  At the site of the new I-70 crossing over the Mississippi River in St. Louis, one of the 11-foot diameter limestone rock cores retrieved from one of the rock sockets drilled for the bridge foundations has been placed on the river bank along with a sign. Our own David Graham stopped by and had some pictures taken when on a personal trip their last year.  So, the next time you are in St. Louis, look for the big hunk of rock on the west bank (St. Louis side) near the new bridge north of the Arch.

Check out our previous posts on this project here.

 

DSC_0723         DSC_0724

Happy Karl Terzaghi’s Birthday 2012 (Updated)

Ah, October….here in the U.S. the leaves are beginning to turn as fall begins (or, in some places, fall off due to summer heat and lack of rain).  The beginning of fall marks a lot of things, such as the Major League Baseball playoffs (insert favorite team name here!), but more importantly the anniversary of the birthday of Karl Terzaghi!

I know that the past few years I have written an extended post highlighting something from Professor Terzaghi’s life or contributions to soil mechanics.  Alas, this fall I let the date creep up on me and my schedule this week left me little time to spend on a more detailed post.  I hope to resume that tradition next year.

Nonetheless, after a busy day of conference calls, design reviews, and calculations of pile resistance (or capacity for all of the folks still living in the ASD world), there will be time for a toast today, or maybe even a slice of birthday cake, in honor of our hero, Karl Terzaghi!

 

UPDATE 2!

Randy Post at Geoprac.net has set up 12 Terzghi Tweets for today.

UPDATE!

My friend (and former professor) Dr. Dave Elton, P.E., currently on sabbatical from Auburn University (War Eagle!), sent this ode today:

A timely ode to our Profession.

The beauty of soil’s

What we consider today,

In which cause we toil,

Be it silt, be it clay.

Foundations are mighty!

The piles we drive!

Geosynthetics are awesome!

We feel so alive!

Tho’ our pride sometimes suffers:

The hillside displaces.

And foundations still settle,

Leaving dirt on our faces.

Still our cause it is just!

From gravel to marl,

Our technology awesome!

Started by Karl!

So onward we press,

With our powers, expert.

As to-day we honor,

The Father of Dirt.

Happy Terzaghi’s Birthday.

Karl Terzaghi (1883 – 1963)

(Celebrate: Go trigger a landslide. You have my permission.)

 

D. Elton, P.E.

Auburn University October 02, 2012

Not copyrighted. Forward at will.

Barry Meyer, P.E. joins DBA!

12_Barry MeyerWe are pleased to announce that Barry J. Meyer, P.E., has joined DBA. Barry is a recognized expert in the design and construction of deep foundations. His over 30 years of geotechnical engineering experience includes time at McClelland Engineers in Houston where he designed large diameter high capacity driven piles for major offshore structures and developed subsea geotechnical instrumentation. He applied that knowledge at Marathon Oil Company where he was part of the team that installed the Steelhead oil production platform in Cook Inlet, Alaska.

After his time in Texas, Barry spent time at both Leighton and Associates and at Law Engineering in California, before joining HDR in their Tampa, Florida office. During this time, his drilled shaft experience includes the H-3 Windward Viaduct on Oahu, Hawaii where drilled shafts were used for the first time to support a major bridge structure and are now the foundation of choice in Hawaii. He was also innovative in the use of the Osterberg O-Cell as part of the repair of the Los Angeles Coliseum after the devastating Northridge earthquake.

Barry has worked on numerous international projects in a variety of capacities including the Confederate Bridge connecting New Brunswick to Prince Edward Island over the ice filled Northumberland Straits; the 55 km elevated Bang Na Expressway Project in Bangkok, Thailand; and the Puente de la Unidad cable-stayed bridge over the Santa Catarina River, Monterey, Mexico. He also has considerable seismic engineering experience, and has designed and constructed flood protection levee systems and water storage reservoirs.

Barry will be based in the Tampa, Florida area. You can check out more details about him on the About Us page of our blog.  Welcome, Barry!

Busy Fall Speaking Schedule for DBA

The months of September and October will be busy for several DBA team members speaking at a variety of conferences and events. Dan Brown and John Turner will be speaking at the ADSC/DFI Drilled Shaft Seminar and Field Day in Denver September 12 and 13. Dan will be giving the 4th Annual Osterberg Memorial Lecture at the DFI Educational Trust dinner being held on the evening of the 12th. Dan and John will be speaking mostly on construction issues during the seminar.   

 

MWGC logoLater in the month, Dan and Robert Thompson are both featured at the 2012 Midwest Geotechnical Conference hosted by Ohio DOT in Columbus, Ohio. Dan will be speaking on base grouted shafts while Robert will give his presentation on the ADSC SE Chapter rock socket load test research program.     

 

STGEC 2012In October, Dan and Robert appear together again at the 2012 Southeastern Transportation Geotechnical Engineering Conference (STGEC) in Richmond, Virginia. This will be the 43rd installment of this conference, hosted this year by the Virginia DOT. Dan will speak on design-build construction issues for deep foundations, while Robert will again present the load test research project. Dan will also speak at the 26th Central Pennsylvania Geotechnical Conference in Hershey, Pennsylvania in October, and Robert will speak at the ADSC Carolinas Chapter meeting in Greenville, NC.

TRB Report: Scour at Bridge Foundation on Rock

TRB has released a new synthesis report covering scour of bridge foundations.  Since this is an issue we are involved in on a lot of our big bridge projects, I felt it appropriate to share and help spread the word (Disclosure:  I have not read the report yet – but plan to soon).  ON large bridge projects we are often on the same team as Ayres Associates, Inc. , the firm of one of the three authors, Paul E. Clopper.

I found out about it from our friend Randy Post of Geoprac.net, so hat tip (h/t) to Randy:

TRB’s National Cooperative Highway Research Program (NCHRP) Report 717: Scour at Bridge Foundations on Rock presents a methodology for estimating the time rate of scour and the design scour depth for a bridge founded on rock. The report also includes design and construction guidelines for application of the methodology.

Check out Randy’s site – he does a great job keeping up with all sorts of things related to geo-engineering.

Go here to get the report (download PDF or purchase printed copy)

Tim Siegel paper in Fellenius GSP

Our own Tim Siegel, P.E., G.E., D.GE. was one of a handful of people invited to submit papers for the recently published Geotechnical Special Publication (GSP) No. 227: Full-Scale Testing and Foundation Design (Honoring Bengt H. Fellenius).  Tim’s paper is on testing of augered cast-in-place piles.  Four piles were installed with varying auger rotations and then load tested in axial compression to evaluate the effect auger rotation on the axial behavior of the piles.

Just follow the link below to get the paper.  You can purchase the entire GSP No. 227 through the Geo-Institute of ASCE (Disclosure: No one at DBA benefits financially from the purchase).

Siegel, T.C. (2012). “Testing of Augered Cast-in-Place Piles installed with Varying Auger Rotations”, Full-Scale Testing and Foundation Design, Honoring Bengt H. Fellenius, Geotechnical Special Publication No. 227, Edited by M.H. Hussein, K. R. Massarsch, G.E. Likins, and R.D. Holtz, ASCE, pp333-348.

 

GeoCongress 2012–Dan Gives A SOP Lecture; John Turner paper published

GeoCongress 2012, Oakland, California

GeoCongress 2012 Proceedings

In addition to the ADSC EXPO 2012 earlier in March (see post here), the annual Geo-Institute meeting for 2012, GeoCongress 2012 , was held later in the month in Oakland, California.  The conference featured a very large technical program with a variety of tracks covering geotechnical engineering topics.  There were also the annual named lectures (Terzaghi, Peck, etc.) and other special events. Randy Post wrote about his time at the GeoCongress at his blog, GeoPrac.net.  Check out all of his posts on the conference, including photos and video.

A key feature of this congress was the State of the Art (SOA) and State of the Practice (SOP) Lectures given throughout the four days.  Thirty prominent engineers were invited to give the SOA/SOP lectures.  Dan gave one of the SOP lectures with his highlighting advances in drilled foundation use and selection. His paper, along with all of the other SOA/SOP lectures, is included in GSP No. 226, Geotechnical Engineering State of the Art and Practice, Keynote Lectures from GeoCongress 2012.  His presentation is linked on the image below.

Pages from DB drilled foundations 2012 Oakland GI [Compatibility Mode]

 

During the regular technical sessions, John Turner presented a paper on a recent project case history on rock-socketed drilled shaft foundations used for a bridge . His paper is in the conference proceedings volume (GSP No. 225):

Turner, J.P., Duffy, J.D., Buell, R. and Zheng, X (2012). “Foundations for the Bridge at Pitkins Curve”, GeoCongress 2012 State of the Art and Practice in Geotechnical Engineering, Geotechnical Special Publication No. 225, ASCE, pp414-423.

Audubon Bridge Officially Complete!

image

Photo Credit: enr.construction.com

The John James Audubon Bridge between New Roads and St. Francisville, Louisiana was officially completed February 27, 2012.  The bridge was opened to traffic in May of last year, but was declared officially completed last month.  This bridge has a special spot in the heart of DBA as it was one of the early large bridges we worked on as a company.  Steve and Dan poured their energy and expertise into the project starting in spring of 2006, all the way to completion of the last foundations in 2010.  Steve spent a good part of his life on site during foundation construction.  I spent a fair amount of time there myself helping Steve cover things now and then, including observing the soil borings for the main tower piers during the design. 

The JJA (as we like to call it) was the subject of one of my early posts when we started this blog in early 2006.  You can scroll through the many posts made during our work on the project here, starting with the soil boring program.

From the press release posted on the TIMED Audubon Bridge site:

Construction on the John James Audubon Bridge has officially come to a close. The new Mississippi River crossing is the longest cable-stayed bridge in the Western Hemisphere, with a 1,583’ main span. Located in south-central Louisiana, the Audubon Bridge connects West Feliciana Parish with Pointe Coupee Parish and is the only bridge between Baton Rouge and Natchez, Mississippi. Construction on the $409 million project began in 2006 and continued when the bridge was opened in May 2011 due to high water levels closing the St. Francisville Ferry sooner than expected.

"Although the Audubon Bridge has been open to traffic for nine months, it’s with a great sense of accomplishment that we are announcing the end of construction on this beautiful structure," said Department of Transportation and Development Secretary Sherri H. LeBas, P.E. "The completion of this bridge opens economic development in south-central Louisiana and will be a source of regional, statewide, and national pride."

Dan ran across this blog entry from Angelle Bergeron, a freelance writer in New Orleans writing as the New Orleans correspondent for Engineering News-Record.  Check it out.

Personally, I look forward to making a trip through the area and getting to cross this beautiful structure.  Hats off to Audubon Bridge Constructors, a joint venture of Flatiron Construction, Granite Construction and Parsons Transportation Group, for a job well done!