All posts by Robert Thompson

LRFD Design Procedures Case Histories – Iowa ASCE Geotechnical Conference

Paul gave a presentation recently at the Iowa ASCE Geotechnical Conference where he discussed two project case histories for LRFD design of bridge foundations.  The meeting was held March 3, 2011 in Ames, Iowa.  In his presentation, Paul gave an overview of the LRFD design procedure as it applies to foundations, reminding them that LRFD is not difficult and that it provides a logical framework for incorporating reliability into foundation design.  Paul talked about our experiences using LRFD for foundation design for two bridges over the Mississippi River: the Hastings Bridge in Hasting Minnesota and the new I-70 bridge in St. Louis, Missouri.  Both bridges are currently under construction.

A PDF of his presentation can be found at the link through the image below, or on our Presentations page.

PJA_Iowa ASCE_3 MAR 2011

Previous Hastings posts

Previous I-70 posts

DBA has a logo!

DBA Logo

After 5 years, Dan Brown and Associates finally has a logo!  We tried to keep it simple, yet still reflect what we do best – deep foundations.  That means piles, micropiles, CFA piles, as well as drilled shafts!  While not necessarily the most exciting thing an engineering firm can do, it is part of growing up as a company. Hopefully you will see it more often at conferences and in publications.

Audubon Bridge Closure–The Span is Complete!

On December 29, 2010, Audubon Bridge Constructors recently “closed” the main span of the John James Audubon Bridge between New Roads and St. Francisville, Louisiana.   Watch the video featured at the top of the page at the bridge link to hear about the bridge, including the drilled shaft foundations!  For something really fascinating, go to the webcams here and scroll back through the various dates.  They have archived images all the way back to start of construction.

Photo: Chris Usery, Figg Bridge Inspectors

The last cables were installed on January 3, 2011 as noted on the project website:

 

The last two cable stays of the longest cable-stayed bridge in the Western Hemisphere were installed on January 3, 2011, five days after the spans were connected. The John James Audubon Bridge, Louisiana’s newest crossing over the Mississippi River, now has all of its 136 cable stays in place.

This bridge will be the longest cable-stayed bridge in North America when it opens later in 2011.  Again, from the project web site:

The spans of the longest cable-stayed bridge in the Western Hemisphere were connected on December 29, 2010, stretching 1/3 of a mile over the Mississippi River. The John James Audubon Bridge, connecting Pointe Coupee and West Feliciana parishes in Louisiana, is approximately 92% complete. Construction of the spans began from both sides of the 500-foot tall towers earlier this year. Both sides continue to progress at a rapid pace, and now the meeting of the spans has occurred.

Steve Dapp and I had the pleasure of working with many great people during our time on site (much more time for Steve than for me!) during foundation construction.  One of them, Chris Ursery of Figg Bridge Inspectors, has been great about providing us with photos now and then to keep us updated of some of the details of the bridge construction.  Chris has granted us permission to share a few of his recent photos, which are shown below or can be seen in our web albums here.

Previous post on Audubon Bridge.

Dan Brown Profiled in DFI Magazine

DB photo Colorado2The Winter 2011 issue of Deep Foundations features Dan in its “People, Projects and Equipment” column.  Virginia Fairweather with DFI talked to several folks in the geotechnical engineering community to learn about Dan, including yours truly.   If you are interested in getting a glimpse inside the man who is Dr. Dan Brown, just check out the link below.  This column is just one of many items featured in each issue of Deep Foundations, only from DFI.  If you aren’t a member of DFI, then consider becoming one!

People, Projects and Equipment, Winter 2011 Deep Foundations

DBA On Team for Hurricane Deck Bridge Replacement

images

(Image source: LakeExpo.com)

DBA is part of a team led by Parsons Transportation Group that was selected to design the replacement of the Hurricane Deck Bridge over The Lake of the Ozarks in Camden County Missouri.  MoDOT has awarded the design contract to Parsons. DBA will be the lead geotechnical engineer with Terracon on the team providing drilling and laboratory services, as well as some foundation engineering support services.  Parsons was chosen due to the innovative approach the team proposed that includes reusing the existing piers (from ENR.com):

MoDOT chose Parsons for proposing an innovative approach to construction that involves the use of temporary pier widening and shifting the existing superstructure over. This method will allow traffic to be maintained on the existing bridge while the new bridge is constructed, potentially resulting in significant cost savings.

A little history of the bridge can be found at Go2Lakeofthe Ozarks.com, including how it got its name: 

Hurricane Deck Bridge of Ozarks crosses the main channel of the lake of approximately mile marker 35. It carries Missouri highway 5 between Versailles and Camdenton. It was built in 1936 –five years after the lake filled. It was named as Hurricane Deck because it was heard that a tornado struck that area which was locally "Hurricanes". It is a nautical term associated with river steamboats. The Hurricane Deck was the uppermost deck which provides and allows everyone to experience the pleasant breezy place and the passing scenery.

Other news links:

Lake News Online – 12/2/2010

Lake Expo.com – 12/2/2010

Hastings Bridge Update

Good morning DBA fans!  I’m here to give you the latest news on the Hastings Bridge project.

The weather has been a bit chilly in Hastings, MN but that isn’t stopping progress.  Paul provided the update below and this picture of one of the beautiful mornings on the site.

Hastings Weather

Installation of the 12.75” diameter open-ended pipe piles for the column-supported embankment (CSE) is well under way.  Each pile is around 165’ in length and will support a geogrid-reinforced load transfer platform (LTP).  Light weight fill, or geofoam, will be used to transition from the CSE into the existing embankment.

Installation of the North Embankment retaining wall piles has begun and is about 50% complete.

The Pier 10 test pile was installed and tested with AFT’s 30MN axial Statnamic device.  The pile is a 42” open-ended pipe pile with 7/8” wall and is embedded about 190’.  Check out the video below.  The Pier 6 test pile has also been installed and tested axially and laterally with a Statnamic device.

That’s all for now, but come back later for additional updates on this exciting project.  Thanks for reading!

kcICON Project Opens Ahead of Schedule

demo 1The kcICON project in Kansas City has been completed six months ahead of schedule and within budget with all lanes and ramps being open on December 18th.  Demolition has begun on the existing Paseo bridge.  You can see some photos of the demolition (like the one in this post – thanks kcICON!) at their Facebook page.  It was a great experience for us to have been a part of this project.  If you want to see all of our previous posts on this, click here.  Other points of interest are linked below.

 

The Kansas City District of MoDOT

ENR 

DBA Project Page

kcICON Facebook Page

kcICON web page

New Bloggers at DBA

I (Robert) will now have some help with posting to the blog.  Our two young staff engineers, Aaron Hudson and David Graham, will be helping me with blog maintenance and posting content.  Until now, I have pretty much written all of the posts and have done all other content updates.  Now you will see some new “by lines” on blog posts in the future.  Thanks for reading!