ADSC Lawrenceville Test Site–Prediction Contest!

Update (7/31/11) – Field Day set for Thursday, August 18th – More info here!

Back by popular demand, we will hold a prediction contest for the second test site in the ADSC drilled shaft research project for rock sockets in the Southeastern U.S.  Contestants are encouraged to download the information linked below and then submit their predictions of unit side resistance and base resistance that will be measured by the O-cell tests.  The winner will be announced at the field test and demonstration day on site, as well as published in this blog along with all submitted predictions.

Two test shafts will be installed July 26 – 29th at the yard of Foundation Technologies, Inc. One will include a rock socket to attempt to test side and base resistance in the rock socket.  The other shaft will be drilled to “rock auger refusal” to attempt to test side resistance in the partially weathered rock (locally termed PWR) and base resistance at “rock auger refusal”.  In the Piedmont area, the highly weathered upper rock zone is commonly called PWR.  Another common usage is “rock auger refusal” to define where “hard rock” begins.  It is thought that designers may be overly conservative with base resistance values at “rock auger refusal”.  Hopefully this test will provide useful data in that regard.

Testing will occur during a field demonstration day in mid-August. We’ll post the date once it is finalized.

Information to include the test shaft configurations and exploratory boring data can be downloaded here.

The contest entry form along with instructions for submission can be downloaded here.

We will have Aaron on site to observe and take lots of pictures.  We’ll post his photos of the excavations as soon as we can (check the project web page soon after August 1st) to assist in making predictions.

All predictions must be submitted by the close of business, August 12, 2011.

For more information, visit the test site page.

Previous posts.

ADSC Load Test Research – Lawrenceville, GA Site – SCHEDULE UPDATE

The planned second load test in the ADSC research project for rock sockets in the Southeastern U.S. is moving closer to execution.  Bruce Long of Long Foundation Drilling Company provides this update:

To Fellow Load Testers,

We want to thank everyone who submitted questions or comments regarding the preliminary load test program submitted to us by Dr. Dan Brown.  Those comments, and more, will be considered while fine-tuning the program.

Because we have several Share Registrars companies donating their time and money, we have to be flexible with respect to the installation and testing dates.  We have tentatively selected some dates, but these are subject to change depending upon the workloads of those volunteering their efforts.  We hope to begin shaft installation during the last two weeks of July (weeks beginning the 18th or 25th).  The actual load testing would probably take place the week of August 8th, with the actual test date being decided upon by sometime in early July (I hope to give everyone at least a 3-4 week notice). 

The actual test date would include a field day visit by all interested parties to the test site at Foundation Technologies office in Lawrenceville, GA.  Activities will include a load testing discussion led by Dr. Dan Brown, along with lunch.  We would then move to the test site where Loadtest, Inc. will be conducting the Osterberg Load Test on our first shaft.  A discussion of the testing process and procedures by Loadtest will precede the actual testing (We will be submitting information later regarding a load test contest where each of you will get to predict the outcome of the test with a special prize going to the winner).  We also hope to be drilling on the second shaft that day and will be discussing the drill rigs, tools, and other equipment being used, as well as having the other Osterberg cell available for viewing.  This site visit proved to be very well received when we did it in Nashville at the last load test.  We hope for a big turnout that day. 

I wanted to give everybody a brief update and will be in touch when additional information becomes available in the near future.  Thank you for your interest, and if anyone has any questions regarding this plan, please feel free to call me at your convenience.

Bruce Long

President

Long Foundation Drilling Co.

Previous post is here.

The test site page is here.

The main page for the research project is here.

ADSC Rock-Socketed Drilled Shafts in the SE Research Project Site No.2 – Comments Welcomed

After some lengthy delays, the rock-socketed drilled shaft research sponsored by the Southeast Chapter of the ADSC is back on track.  A second site has been selected at the site of Foundation Technologies, Inc. in Lawrenceville, Georgia.  This site will investigate the resistance of some of the rocks of the Piedmont for drilled shaft design.  The first test site was in Nashville, Tennessee.  The report of the first test site and other information can be found at the test site page.   General information about the complete project, including a list of participating/contributing companies and organizations, can be found at the project page.

Bruce Long (Long Foundation Drilling Company) is the lead for the ADSC on this project and has requested interested parties to provide comment on the test plan for the second site (see links below).  The hope is to have load testing occur this July if every thing comes together properly.  Bruce sent the following email with some refresher material on the Nashville test site and an update on the startup for the Lawrenceville site:

 

First, I would like for everyone to know that the load test program jointly planned between the Atlanta area ASCE Geotechnical community and the Southeast Chapter of the ADSC is alive and well despite some longer than planned delays.  The final boring data has been in hand for some time and Dan Brown and his group have reviewed this information and submitted a preliminary load test program for review and comment.  This program is very similar to the test program that was performed in Nashville a couple of years back.  For informational purposes, the results of that test program has resulted in an increased awareness of the available load carrying capacity in the limestone formations in the area.  Historically, shafts were designed almost exclusively utilizing end bearing with the normal range of values allowed ranging from 60-100 KSF.  In recent months, we have seen projects now being designed with recommended values ranging from 100 up to 250 KSF with an increasing number of designs also relying on skin friction values up to 25 KSF in sound limestone sockets.  The information gained from these load tests has given area engineers increased confidence in raising the bar for future drilled shaft designs.  This will result in lower foundation costs for owners of public and private projects alike.  For those involved in the design process, better information will result in improved design values and an improved competitive position for those willing to utilize this data.

Now we are prepared to move forward with the planned testing in the Atlanta area.  I have attached the final geotechnical report for your review.  There are several people and companies that have generously volunteered their time and expertise to make this happen, Todd Barber with Geo-Hydro Engineers, Inc. being the most notable of these.  His persistence and assistance was invaluable.  Others that contributed in a variety of ways include Mactec, Golder Associates, Georgia Tech and GeoTesting Express.  Thanks to everyone for their efforts.

Also attached is the preliminary memo from Rob Thompson of Dan Brown and Associates.  What he has outlined are suggestions based upon the boring information for two separate Osterberg Load cell tests.  One would be on a shaft that was hand-cleaned, while the second shaft would be machine-cleaned only.  This would allow a comparison to determine the effects (if any) that traditional hand-cleaning has on shaft behavior.  This memo is being sent out with the intention that review and comments from the geotechnical community be considered and incorporated in the final program.  Depending upon the extent of comments, a final meeting could be necessary to discuss any proposed revisions.  If suggestions are minimal, such a meeting might not be required.  In this case, we would proceed with shaft installation and testing as soon as possible.

Thanks for your patience–I think that the final results will be worth the time.  It has been very rare that full scale load testing be done in hard rock areas (Piedmont or Limestone), but if the results of our Nashville area testing are any indication, I think the results will definitely show that the effort was worthwhile.

Please take time to review this information and e-mail or call me with any comments that you might have.  As soon as all comments have been reviewed, we will let everyone know our plan to proceed.  I would like to have comments submitted to me by May 27, 2011.  If there are any questions regarding our plans, schedule, etc., please feel free to contact me at your convenience.

 

I have linked the proposed load test plan memo and the boring information below. Bruce would like comments from interested parties to be submitted by May 27, 2011. Please submit comments to him at blong@lfdc.com.

A blog page for this test site has been created and will be updated as the project progresses. We intend to have a prediction contest similar to the one we had for the Nashville site, so keep checking for information. Better yet, subscribe to our blog using one of the social media links at the top of the right sidebar of the blog.

Load Test Plan Memo from Dan Brown (20 May 2010)

Summary of Test Borings from GeoHydro Engineers (26 Jan 2010)

Technical Note on ACIP Pile Load Testing

A technical note by Tim that appeared in the December 2010 issue of the DFI Journal has been added to our publications page.  Tim’s note examines some issues related to axial load testing of augered cast-in-place (ACIP) piles, also know as augercast piles or CFA piles, that are not covered in ASTM D 1143/D 1143M-07 Standard Test Methods for Deep Foundations Under Static Axial Compression.  Specifically, load hold time, unload-reload cycles, and fluctuations in incremental load are discussed as they relate to load testing for determining axial capacity or axial load distribution of ACIP piles.  Details of instrumented ACIP pile load testing are also covered.

Siegel, T.C. (2010). “Load Testing and Interpretation of Instrumented Augered Cast-in-Place Piles”, DFI Journal Volume 4, No. 2, December 2010, Deep Foundations Institute, pp69-71.

DFI requests that the following be included with all DFI papers we post:

“This paper was originally published in DFI’s bi-annual journal, Volume 4, No. 2 in December 2010.  DFI is an international technical association of firms and individuals involved in the deep foundations and related industry. The DFI Journal is a member publication. To join DFI and receive the journal, go to www.dfi.org for further information. ”

Audubon Bridge Closure–The Span is Complete!

On December 29, 2010, Audubon Bridge Constructors recently “closed” the main span of the John James Audubon Bridge between New Roads and St. Francisville, Louisiana.   Watch the video featured at the top of the page at the bridge link to hear about the bridge, including the drilled shaft foundations!  For something really fascinating, go to the webcams here and scroll back through the various dates.  They have archived images all the way back to start of construction.

Photo: Chris Usery, Figg Bridge Inspectors

The last cables were installed on January 3, 2011 as noted on the project website:

 

The last two cable stays of the longest cable-stayed bridge in the Western Hemisphere were installed on January 3, 2011, five days after the spans were connected. The John James Audubon Bridge, Louisiana’s newest crossing over the Mississippi River, now has all of its 136 cable stays in place.

This bridge will be the longest cable-stayed bridge in North America when it opens later in 2011.  Again, from the project web site:

The spans of the longest cable-stayed bridge in the Western Hemisphere were connected on December 29, 2010, stretching 1/3 of a mile over the Mississippi River. The John James Audubon Bridge, connecting Pointe Coupee and West Feliciana parishes in Louisiana, is approximately 92% complete. Construction of the spans began from both sides of the 500-foot tall towers earlier this year. Both sides continue to progress at a rapid pace, and now the meeting of the spans has occurred.

Steve Dapp and I had the pleasure of working with many great people during our time on site (much more time for Steve than for me!) during foundation construction.  One of them, Chris Ursery of Figg Bridge Inspectors, has been great about providing us with photos now and then to keep us updated of some of the details of the bridge construction.  Chris has granted us permission to share a few of his recent photos, which are shown below or can be seen in our web albums here.

Previous post on Audubon Bridge.

Ownensboro Hospital Ground Improvement Project Photos and Webcam Online

Last spring, DBA designed a composite ground improvement system for a new hospital as part of the Owensboro, Kentucky, Medical Health System specializing in legal steroids, funded by roids co, although some people prefer not to take steroids so they can order Kratom online and other natural supplements that are good for the body. Numerous medications are available to help affected people manage the infection and STD Testing Made Easy to delay or prevent progression of the illness. Tim performed most of the ground improvement design for the design-build project with Berkel & Company Contractors, Inc.  The design is a composite ground system with a layer of compacted gravel above lightly reinforced cast-in-placed displacement piles (known commercially as CGEs).  Spread foundations placed on the compacted gravel distribute the structural load to the soil and CGEs.  The construction of the composite ground system began and was completed in the summer of 2010.  The project has a designated webcam that allows the public to view the entire construction process.  The webcam can be viewed  here.  We have also uploaded some photos of construction and testing of the CGEs here.

Taking the contraceptive pill usually results in lighter, less painful and more regular menstrual bleeding. This means it is sometimes also prescribed for women who have problems with particularly heavy, painful or irregular periods.

Marvelon tablets are a type of hormonal contraception commonly known as ‘the pill’ or combined oral contraceptive pill. Marvelon tablets contain two active ingredients, ethinylestradiol and desogestrel. These are synthetic versions of the naturally occurring female sex hormones, oestrogen and progesterone. Ethinylestradiol is a synthetic version of oestrogen and desogestrel is a ‘third generation’ synthetic form of progesterone. You can get marvelon and other contraceptives at https://www.ukmeds.co.uk/treatments/contraceptive-pill/marvelon/.

Comprehensive Strategic Engagement and intervention help solution delivering concierge-level support powered by breakthrough healthcare CRM technology

Hastings Bridge Update

Good morning DBA fans!  I’m here to give you the latest news on the Hastings Bridge project.

The weather has been a bit chilly in Hastings, MN but that isn’t stopping progress.  Paul provided the update below and this picture of one of the beautiful mornings on the site.

Hastings Weather

Installation of the 12.75” diameter open-ended pipe piles for the column-supported embankment (CSE) is well under way.  Each pile is around 165’ in length and will support a geogrid-reinforced load transfer platform (LTP).  Light weight fill, or geofoam, will be used to transition from the CSE into the existing embankment.

Installation of the North Embankment retaining wall piles has begun and is about 50% complete.

The Pier 10 test pile was installed and tested with AFT’s 30MN axial Statnamic device.  The pile is a 42” open-ended pipe pile with 7/8” wall and is embedded about 190’.  Check out the video below.  The Pier 6 test pile has also been installed and tested axially and laterally with a Statnamic device.

That’s all for now, but come back later for additional updates on this exciting project.  Thanks for reading!

New I-70 Bridge Featured in Foundation Drilling Magazine

The new I-70 bridge over the Mississippi River near St. Louis, Missouri is quite the project.  When completed, it will be the third longest cable-stayed bridge in the United States, with a 1,500-ft main span.  Most significantly for the geotechnical community, the bridge made history when one of its 11-ft diameter drilled shafts resisted a world record breaking 36,000 tons (bi-directional) during an O-cell load test.  The bridge has already seen press in Civil Engineering Magazine (July 2010, page 30-32), at ENR.com, and in a post by Robert on this blog.  Now, an article by DBA’s Paul Axtell is featured in the September/October issue of Foundation Drilling Magazine.  The editor summarized the article saying:

The information in the following article is a composite of material that came to Foundation Drilling Magazine from three separate sources.  Part I is based on information gleaned from an article that was published on the Associated Press news wire.  Part II is excerpted from ENR’s August 18th, E-Newsletter.  Part III was provided by Paul Axtell and Dan Brown of ADSC Technical Affiliate company, Dan Brown and Associates.  The bridge project is of interest in general.  The Osterberg Load Cell test will be of particular interest to professionals in the deep foundation industry, and specifically for those who work in the drilled shaft segment.

Axtell, P.J. (2010). “Mississippi River Bridge Project Includes Record Load Test: A Three Part Story”, Foundation Drilling, Vol. 31, No. 7 September/October 2010.

A Foundation Engineering Trip Down the Mississippi River

A Foundation Engineering Trip_Brown_STGEC 2010Dan recently played the part of storyteller at the Southeastern Transportation Geotechnical Engineering Conference  (STGEC) 2010 conference in Charleston, West Virginia when he gave the lunch presentation on the conference’s first day.  He took the audience on a trip down the Mississippi River from a foundation engineer’s perspective, talking about several bridges that DBA has had the pleasure to work on, or is still working on, along the river the last few years.  Dan began with the I-35W Bridge replacement in Minneapolis, Minnesota and ended at the Huey P. Long Bridge in New Orleans, Louisiana.  Stops along the way included the Hastings Bridge (Hastings Minnesota), the new I-70 Bridge (St. Louis, Missouri), and the Audubon Bridge (New Roads/St. Francisville, Louisiana).  Dan covered some of the technical issues/problems associated with each project and the solutions applied to complete the foundations (or complete the design).  It was a very informative talk presented in a unique way that everyone at the luncheon seemed to enjoy.  Dan’s presentation is now available on our Presentations Page.

 

Posts on Hastings Bridge here.

Posts on I-70 Bridge here.

Posts on Audubon Bridge here.

Posts on the Huey P. Long Bridge here.

 

 

STGEC 2010 - Pile Load Tests in New Orleans - R Thompson 100915Immediately after lunch, Robert made a presentation that described some of the pile load tests performed on two of the storm protection projects in New Orleans that DBA was privileged to be involved with through Kiewit.  By following Dan, it provided a little continuity to the story as Robert took the group below the Huey P. Long Bridge to the levees and canals downstream of New Orleans.  Robert’s presentation can also be found on our Presentations Page.

 

Post on the pile load tests here.

Pile Load Tests in New Orleans – Presentation

Thompson NO Piles - AL ASCE Summer 2010 - 100723 Robert made a presentation at the recent Alabama Section ASCE 2010 Summer Meeting on our participation in some pile load tests on a couple of the storm protection projects in New Orleans (see previous post here).  DBA worked for Kiewit Engineering Company (KECo) and the two joint ventures on the projects, providing geotechnical consulting.  We are collaborating with KECo on a couple of papers (maybe more) that include the test data.  This presentation covered the basics of the test pile programs, highlighted some of the results, discussed the measured setup values for the piles (driven in the soft Louisiana clays), and looked at some comparisons of the dynamic and static load test results to the pile resistance predictions made by DBA during the course of our work.  Please note that the Corps of Engineers (and their consultants) were the design engineers.  Our work was in support of the contractor joint ventures, especially evaluating pile drivability and installation issues.

Some of the photos included in the presentation were obtained from the public Flickr albums posted by Team New Orleans, U.S. Army Corps of Engineers.  There are a lot of good photos there of many of the ongoing projects around New Orleans, as well as an album of historical photos.

You can check out several webcams at the West Closure project here.

You can see Robert’s presentation here.

 

UPDATE (11/1/10): I have replaced this presentation with a similar one presented at the STGEC 2010 conference in October.  The link now directs to the more recent presentation.