I have added a new project to our project list. DBA provided several key services for the AEC Charles R. Lowman Power Plant Riverbank Stabilization project. Erik and Dan developed a design that used 100 drilled shaft foundations to stabilize the riverbank and allow AEC to construct new air quality control improvements. The shafts are 54 inches in diameter and extend over 100 feet deep to socket into limestone. Click on the image to download a summary sheet.
Powered by Zoundry