Tag Archives: Barry J. Meyer

Barry Meyer, P.E. joins DBA!

12_Barry MeyerWe are pleased to announce that Barry J. Meyer, P.E., has joined DBA. Barry is a recognized expert in the design and construction of deep foundations. His over 30 years of geotechnical engineering experience includes time at McClelland Engineers in Houston where he designed large diameter high capacity driven piles for major offshore structures and developed subsea geotechnical instrumentation. He applied that knowledge at Marathon Oil Company where he was part of the team that installed the Steelhead oil production platform in Cook Inlet, Alaska.

After his time in Texas, Barry spent time at both Leighton and Associates and at Law Engineering in California, before joining HDR in their Tampa, Florida office. During this time, his drilled shaft experience includes the H-3 Windward Viaduct on Oahu, Hawaii where drilled shafts were used for the first time to support a major bridge structure and are now the foundation of choice in Hawaii. He was also innovative in the use of the Osterberg O-Cell as part of the repair of the Los Angeles Coliseum after the devastating Northridge earthquake.

Barry has worked on numerous international projects in a variety of capacities including the Confederate Bridge connecting New Brunswick to Prince Edward Island over the ice filled Northumberland Straits; the 55 km elevated Bang Na Expressway Project in Bangkok, Thailand; and the Puente de la Unidad cable-stayed bridge over the Santa Catarina River, Monterey, Mexico. He also has considerable seismic engineering experience, and has designed and constructed flood protection levee systems and water storage reservoirs.

Barry will be based in the Tampa, Florida area. You can check out more details about him on the About Us page of our blog.  Welcome, Barry!