Get the New FHWA Drilled Shaft Manual

Dan’s Speaking Schedule

September 21-23, 2010 - NHI Drilled Shaft Course, Iowa

October 5-6, 2010 - 42nd STGEC, Charleston, West Virginia

October 14-15, 2010 - DFI 35th Conference on Deep Foundations, Hollywood, California

October 19-21, 2010 - - NHI Drilled Shaft Course, Iowa

November 10, 2010 - ADSC Drilled Shaft Seminar, New York, New York

December 1-2, 2010 - TRB 27th Bridge Conference, San Antonio, Texas

Other DBA Team Speaking Appearences

Tim Siegel (Sept 30-Oct 1, 2010): North Carolina ASCE Section Annual Meeting, Asheville, NC

Robert Thompson (October 5-6, 2010):42nd STGEC, Charleston, West Virginia

Tim Siegel (October 29, 2010): Deep Foundation Design - Axial Capacity, Settlement, and Lateral Resistance, Norfolk, Virginia

Tim Siegel (December 16, 2010): Shallow Foundation Design, Atlanta, Georgia

Steve Dapp (January 11, 2011): 2011 Louisiana Transportation Conference, Baton Rouge, Louisiana

Conferences, Meetings, Seminars, Workshops

John James Audubon Bridge, New Roads, Louisiana

AudubonBridge_ShoreView_042706.jpg

John James Audubon Bridge – New Roads and St. Francisville, Louisiana.

Download DBA Project Summary Sheet – JJA Bridge

Dapp, S.D. and Brown, D.A. (2010). “Evaluation of Base Grouted Drilled Shafts at the Audubon Bridge”, GeoFlorida 2010, Advances in Analysis, Modeling and Design, Geotechnical Special Publication No. 199, ASCE, pp1553-1562.

Geo-Florida 2010 presentation by Dr. Steve Dapp.

Project Status: Active.

Project Websites: Project Home Page. Project Updates.

DBA Client: Audubon Bridge Constructors Joint Venture, a joint venture of Flatiron Construction, Granite Construction and Parsons Transportation Group.

DBA Services: DBA performed geotechnical engineering and design of the drilled shaft foundations for the main bridge piers and the high level approach spans. Other services included:

  • QA review of the geotechnical reports for the pile supported approach bridges
  • Developing and analyzing the drilled shaft load test plan
  • Geotechnical engineering consulting during trial shaft installation
  • Geotechnical engineering consulting during production shaft construction

Project Highlights: The John James Audubon Bridge project is a new Mississippi River crossing between Pointe Coupee and West Feliciana parishes in south central Louisiana, replacing and existing ferry service. The project includes 12 miles of roads and 8 bridges – 7 approach structures and the main structure over the river. The seven approach bridges are supported on driven prestressed precast concrete (PCC) piles. The river bridge has 4 lanes and is almost 2.5 miles long with prestressed PCC pile supported low level approaches, drilled shaft supported high approaches, and a cable-stayed main span that will be the longest in North America when it is complete. The cable-stayed span is supported by two main piers in the Mississippi River. Each pier has twenty 8-foot diameter tip grouted drilled shafts as its foundation system.

DBA Photos:

JJA Bridge Soil Exploration May 2006

JJA Bridge Drilled Shaft Construction 2007
JJA Bridge Construction – Shaft W5 and W21 July 08
JJA Bridge Construction – Shaft W12 and WHA Test Shaft – August 2008
JJA Bridge Construction – East Pier – September 2008
JJA Bridge Construction – East Pier Temporary Bent Piles – September 2008
JJA Construction – West Pier, WHA Test Shaft, and O-Cell tests – October 2008
JJA Construction – West Pier and West High Approach Shafts – April 2009
JJA Construction – East Pier and East High Approach – April 2009
JJA Construction – Shaft Excavation, PIle Driving, and Cofferdams – May 2009
JJA Construction – Base Grouting and Other Construction – June 2009
JJA Construction – Pier 2W – September 2009 Photos
JJA Construction – Shaft 3W South Load Test – October 2009
JJA Construction 2010

Project Websites: Project Home Page. Project Updates.

Media Links: ENR.com January 9, 2008

Key Participants:

Owner: ladotd-logo.png Louisiana Department of Transportation and Development

Program Manager: logo_timed.png Louisiana TIMED Program

Design/Build Team:

audubonbconst-logo_crop.jpg Audubon Bridge Constructors, a joint venture of:

logo-parsons.gif Parsons Transportation Group, flatiron-logo.jpg Flatiron Construction Corporation,

logo_granite.png Granite Construction, Inc.

Geotechnical Engineers:

Dan Brown and Associates, LLC and psilogo.gif PSI, Inc.

Archives

GeotechSearch.com

DBA Photo Albums

Artistic Construction - Vol 1JJA Construction 2010
LPV-145 Test Piles 2009-2010DFI 2009
JJA Construction - Shaft 3W South Load Test - October 2009Huey P. Long Bridge Drilled Shafts - October 2009
JJA Construction - Pier 2W - September 2009 PhotosUniv Kansas Research - Lateral Load Test on Drilled Shafts
Huey P. Long Bridge, New Orleans - Test Shaft Construction - July 16-19, 2009GIWW West Closure Complex Test Piles June and July 2009
Garden State Parkway Mullica River Bridge - Test Shaft Construction - June 2009JJA Construction - Base Grouting and Other Construction - June 2009
JJA Construction - Shaft Excavation, PIle Driving, and Cofferdams - May 2009JJA Construction - East Pier and East High Approach - April 2009
KcICON River Bridge - Bent 1, Bent 5, and Pylon - March 2009JJA Construction - West Pier and West High Approach Shafts - April 2009