Get the New FHWA Drilled Shaft Manual

Get the NCHRP Synthesis 418 – Pile Criteria From Test Pile Data

Dan’s Speaking Schedule

March 16, 2012 - "Advanced" Design and Construction Issues with Drilled Shaft Foundations; Case Histories - ADSC Equipment EXPO and Technical Conference - San Antonio, Texas

March 26-28, 2012 - State of the Art and Practice for Drilled Foundations - GeoCongress 2012 - ASCE/Geo-Institute - San Francisco, California

Other DBA Team Speaking Appearences

Tim Siegel (January 22, 2012): Innovative Techniques for Characterizing Karst Terrain, Workshop on Geo-innovation in Subsurface Exploration, TRB Annual Meeting, Washington, D.C.

John Turner and Robert Thompson (February 21-23, 2012): NHI Drilled Shaft Course - Kansas DOT, Topeka, Kansas

Robert Thompson (February 24, 2012): Conservatism in Drilled Shaft Design When Utilizing Rock Sockets, Alabama Transportation Conference, Montgomery, Alabama

Tim Siegel (March 15, 2012): Micropile Design Installation and Performance for the Foothills Parkway, ADSC Equipment EXPO and Technical Conference, San Antonio, Texas

Robert Thompson (March 15, 2012): Full-Scale Load Tests on Drilled Shafts in Tennessee and Georgia, ADSC Equipment EXPO and Technical Conference, San Antonio, Texas

Erik Loehr (March 15, 2012): Slope Stabilization Using Micropiles, ADSC Equipment EXPO and Technical Conference, San Antonio, Texas

TBA (April 10-12, 2012): NHI Drilled Shaft Course - South Carolina DOT, Columbia, South Carolina

Conferences, Meetings, Seminars, Workshops

John James Audubon Bridge, New Roads, Louisiana

AudubonBridge_ShoreView_042706.jpg

John James Audubon Bridge – New Roads and St. Francisville, Louisiana.

Download DBA Project Summary Sheet – JJA Bridge

Dapp, S.D. and Brown, D.A. (2010). “Evaluation of Base Grouted Drilled Shafts at the Audubon Bridge”, GeoFlorida 2010, Advances in Analysis, Modeling and Design, Geotechnical Special Publication No. 199, ASCE, pp1553-1562.

Geo-Florida 2010 presentation by Dr. Steve Dapp.

Project Status: Active.

Project Websites: Project Home Page. Project Updates.

DBA Client: Audubon Bridge Constructors Joint Venture, a joint venture of Flatiron Construction, Granite Construction and Parsons Transportation Group.

DBA Services: DBA performed geotechnical engineering and design of the drilled shaft foundations for the main bridge piers and the high level approach spans. Other services included:

  • QA review of the geotechnical reports for the pile supported approach bridges
  • Developing and analyzing the drilled shaft load test plan
  • Geotechnical engineering consulting during trial shaft installation
  • Geotechnical engineering consulting during production shaft construction

Project Highlights: The John James Audubon Bridge project is a new Mississippi River crossing between Pointe Coupee and West Feliciana parishes in south central Louisiana, replacing and existing ferry service. The project includes 12 miles of roads and 8 bridges – 7 approach structures and the main structure over the river. The seven approach bridges are supported on driven prestressed precast concrete (PCC) piles. The river bridge has 4 lanes and is almost 2.5 miles long with prestressed PCC pile supported low level approaches, drilled shaft supported high approaches, and a cable-stayed main span that will be the longest in North America when it is complete. The cable-stayed span is supported by two main piers in the Mississippi River. Each pier has twenty 8-foot diameter tip grouted drilled shafts as its foundation system.

DBA Photos:

JJA Bridge Soil Exploration May 2006

JJA Bridge Drilled Shaft Construction 2007
JJA Bridge Construction – Shaft W5 and W21 July 08
JJA Bridge Construction – Shaft W12 and WHA Test Shaft – August 2008
JJA Bridge Construction – East Pier – September 2008
JJA Bridge Construction – East Pier Temporary Bent Piles – September 2008
JJA Construction – West Pier, WHA Test Shaft, and O-Cell tests – October 2008
JJA Construction – West Pier and West High Approach Shafts – April 2009
JJA Construction – East Pier and East High Approach – April 2009
JJA Construction – Shaft Excavation, PIle Driving, and Cofferdams – May 2009
JJA Construction – Base Grouting and Other Construction – June 2009
JJA Construction – Pier 2W – September 2009 Photos
JJA Construction – Shaft 3W South Load Test – October 2009
JJA Construction 2010
JJA Pictures from Chris Ursery (FIGG)

Project Websites: Project Home Page. Project Updates.

Media Links: ENR.com January 9, 2008

Key Participants:

Owner: ladotd-logo.png Louisiana Department of Transportation and Development

Program Manager: logo_timed.png Louisiana TIMED Program

Design/Build Team:

audubonbconst-logo_crop.jpg Audubon Bridge Constructors, a joint venture of:

logo-parsons.gif Parsons Transportation Group, flatiron-logo.jpg Flatiron Construction Corporation,

logo_granite.png Granite Construction, Inc.

Geotechnical Engineers:

Dan Brown and Associates, LLC and psilogo.gif PSI, Inc.

Archives

GeotechSearch.com

DBA Photo Albums

ADSC SE Drilled Shaft Research Project, Lawrenceville, GA Test SiteDBA Honors and Awards
JJA Pictures from Chris Ursery (FIGG)Hastings Bridge Construction
Ownesboro Hospital Ground ImprovementArtistic Construction - Vol 1
JJA Construction 2010LPV-145 Test Piles 2009-2010
DFI 2009JJA Construction - Shaft 3W South Load Test - October 2009
Huey P. Long Bridge Drilled Shafts - October 2009JJA Construction - Pier 2W - September 2009 Photos
Univ Kansas Research - Lateral Load Test on Drilled ShaftsHuey P. Long Bridge, New Orleans - Test Shaft Construction - July 16-19, 2009
GIWW West Closure Complex Test Piles June and July 2009Garden State Parkway Mullica River Bridge - Test Shaft Construction - June 2009