Get the New FHWA Drilled Shaft Manual

Dan’s Speaking Schedule

September 21-23, 2010 - NHI Drilled Shaft Course, Iowa

October 5-6, 2010 - 42nd STGEC, Charleston, West Virginia

October 14-15, 2010 - DFI 35th Conference on Deep Foundations, Hollywood, California

October 19-21, 2010 - - NHI Drilled Shaft Course, Iowa

November 10, 2010 - ADSC Drilled Shaft Seminar, New York, New York

December 1-2, 2010 - TRB 27th Bridge Conference, San Antonio, Texas

Other DBA Team Speaking Appearences

Tim Siegel (Sept 30-Oct 1, 2010): North Carolina ASCE Section Annual Meeting, Asheville, NC

Robert Thompson (October 5-6, 2010):42nd STGEC, Charleston, West Virginia

Tim Siegel (October 29, 2010): Deep Foundation Design - Axial Capacity, Settlement, and Lateral Resistance, Norfolk, Virginia

Tim Siegel (December 16, 2010): Shallow Foundation Design, Atlanta, Georgia

Steve Dapp (January 11, 2011): 2011 Louisiana Transportation Conference, Baton Rouge, Louisiana

Conferences, Meetings, Seminars, Workshops

Biloxi Bay Bridge, Mississippi

biloxi rednering.jpg

U.S. 90 Bridge over Biloxi Bay – Biloxi and Ocean Springs, Mississippi.

Download DBA Project Summary Sheet – Biloxi Bay Bridge

Thompson, W.R., Held, L., and Saye, S., 2009. “Test Pile Program to Determine Axial Capacity and Pile Setup for the Biloxi Bay Bridge”, DFI Journal Volume 3, No. 1, May 2009, Deep Foundations Institute, pp13-22.

US 90 Biloxi Bay Bridge Test Pile Program – W. Robert Thompson, III, P.E. – 2007 AL Section ASCE Summer Meeting, Orange Beach, AL – July 26, 2007

CE magazine biloxi

Project Status: Completed 2008.

Click on the image below for a slide show of photos from the project site, or go to the album.

DBA Client: Parsons Transportation Group, the bridge designer.

DBA Services: DBA worked for Parsons, developing the test pile program, providing QC and QA review of the geotechnical reports and analysis of the project geotechnical engineer, and performing the analysis of the lateral load tests.

Project Highlights: Hurricane Katrina caused significant damage to transportation structures on the Gulf coast in August, 2005, including the destruction of the US 90 Bridge over Biloxi Bay, Mississippi. Part of the winning proposal for the replacement bridge included a comprehensive test pile program of indicator piles and load test piles. A total of 21 indicator piles were installed on the project. Each indicator pile was dynamically tested during driving using a PDA. Five load tests were also performed: two Statnamic axial, two Statnamic lateral, and one static axial. The results of the test pile program established driving criteria for production piles that included end of drive blow counts and pile tip elevations with an appropriate allowance for setup. The program also confirmed that the planned installation equipment and techniques of the contractor would install the piles to the design tip elevations. A thorough program of restrike measurements at a range of times after initial driving on the indicator piles provided a systematic documentation of pile setup in the soil profiles on the site. Unit side shear values up to 2.5 ksf in clay and 4 ksf in sand were determined from the load tests and CAPWAP analysis of the restrike data. These resistance values were used to set pile tip elevations. A dimensionless setup factor “S” was calculated by dividing the restrike resistance by the end of drive resistance. This factor varied from 1.5 for piles in sand to 3.0 for piles in clay and helped establish an end-of drive blow count that included an allowance for setup. The effort to establish the setup relationship on the project provided assurance to the MSDOT that piles driven to satisfy the established end of drive criteria would ultimately achieve the required ultimate axial resistance.

Key Participants:

Owner:logo-mdot_1.gif Mississippi Department of Transportation

Lead Designer: logo-parsons.gif Parsons Transportation Group

Geotechnical Engineer: eustispageone-rev-0304_01.gif Eustis Engineering Company, Inc.

Contractors: logo-gc_1.gifGC Constructors, AJV – a joint venture of:

logo-massman.gif Massman Construction Company, logo-kiewit.gif Kiewit Southern, logo-traylor.gif Traylor Brothers, Inc.

Archives

GeotechSearch.com

DBA Photo Albums

Artistic Construction - Vol 1JJA Construction 2010
LPV-145 Test Piles 2009-2010DFI 2009
JJA Construction - Shaft 3W South Load Test - October 2009Huey P. Long Bridge Drilled Shafts - October 2009
JJA Construction - Pier 2W - September 2009 PhotosUniv Kansas Research - Lateral Load Test on Drilled Shafts
Huey P. Long Bridge, New Orleans - Test Shaft Construction - July 16-19, 2009GIWW West Closure Complex Test Piles June and July 2009
Garden State Parkway Mullica River Bridge - Test Shaft Construction - June 2009JJA Construction - Base Grouting and Other Construction - June 2009
JJA Construction - Shaft Excavation, PIle Driving, and Cofferdams - May 2009JJA Construction - East Pier and East High Approach - April 2009
KcICON River Bridge - Bent 1, Bent 5, and Pylon - March 2009JJA Construction - West Pier and West High Approach Shafts - April 2009