Get the New FHWA Drilled Shaft Manual

Get the NCHRP Synthesis 418 – Pile Criteria From Test Pile Data

Dan’s Speaking Schedule

March 16, 2012 - "Advanced" Design and Construction Issues with Drilled Shaft Foundations; Case Histories - ADSC Equipment EXPO and Technical Conference - San Antonio, Texas

March 26-28, 2012 - State of the Art and Practice for Drilled Foundations - GeoCongress 2012 - ASCE/Geo-Institute - San Francisco, California

Other DBA Team Speaking Appearances

Tim Siegel (January 22, 2012): Innovative Techniques for Characterizing Karst Terrain, Workshop on Geo-innovation in Subsurface Exploration, TRB Annual Meeting, Washington, D.C.

John Turner and Robert Thompson (February 21-23, 2012): NHI Drilled Shaft Course - Kansas DOT, Topeka, Kansas

Robert Thompson (February 24, 2012): Conservatism in Drilled Shaft Design When Utilizing Rock Sockets, Alabama Transportation Conference, Montgomery, Alabama

Tim Siegel (March 15, 2012): Micropile Design Installation and Performance for the Foothills Parkway, ADSC Equipment EXPO and Technical Conference, San Antonio, Texas

Robert Thompson (March 15, 2012): Full-Scale Load Tests on Drilled Shafts in Tennessee and Georgia, ADSC Equipment EXPO and Technical Conference, San Antonio, Texas

Erik Loehr (March 15, 2012): Slope Stabilization Using Micropiles, ADSC Equipment EXPO and Technical Conference, San Antonio, Texas

John Turner (March 27, 2012): Foundations for the Bridge at Pitkins Curve - GeoCongress 2012 - ASCE/Geo-Institute - Oakland, California

TBA (April 10-12, 2012): NHI Drilled Shaft Course - South Carolina DOT, Columbia, South Carolina

John Turner (May 7-10, 2012): Highway Geology Symposium, Redding, CA

Conferences, Meetings, Seminars, Workshops

Tim Siegel to Teach Karst Seminar in Tennessee, awarded Diplomate, Geotechnical Engineering

Our own Tim Siegel, P.E., D.GE. will be part of the seminar Foundation Design in Karst Terrain in two locations:  Johnson City, TN (also known as the Tri-Cities) on June 16th, and in Chattanooga on August 27th.  Tim will be instructing on evaluating karst terrain and designing foundations in such terrain.  If you are interested in the seminar, information can be found here.

 

We also want to say Congratulations! to Tim for receiving the specialty certification Diplomate, Geotechnical Engineering (D.GE) from The Academy of Geo-Professionals (AGP).  Tim received the designation at the recent Geo-Institute conference Geo-Florida 2010 at West Palm Beach.  The excerpt below comes form the AGP web site.  Tim is on the second row, far left.

 

Latest Class of D.GEs Inducted in West Palm Beach, FL


(Back Row, Left to Right: Timothy Siegel, Melvin Esrig, John Wolosick, Thomas Zimmie, Kenneth Stokoe, II, Roberto Sanchez, Marco Boscardin, Allen Cadden, Thomas Witherspoon, Daniel Pradel, Edward Ulrich, Jr., Robert Lukas; Front Row, Left to Right: Peter Nicholson, Derek Cornforth, Don Dotson, Larry Jedele, Delon Hampton, Joram Amir, Anand Puppala, Larry Madrid, Ivan Contreras, Craig Benson, Tuncer Edil)

The Academy of Geo-Professional (AGP), held its latest induction ceremony on February 21st in West Palm Beach, Florida at the GeoFlorida 2010. If you have at least 8 years (post-licensure) in the geotechnical field, a P.E., and a Masters or equivalent, then you may qualify to become a Diplomate, Geotechnical Engineering (D.GE). Above is a picture of the Diplomates who were present to receive their certification plaque and pin.

Archives

GeotechSearch.com

DBA Photo Albums

ADSC SE Drilled Shaft Research Project, Lawrenceville, GA Test SiteDBA Honors and Awards
JJA Pictures from Chris Ursery (FIGG)Hastings Bridge Construction
Ownesboro Hospital Ground ImprovementArtistic Construction - Vol 1
JJA Construction 2010LPV-145 Test Piles 2009-2010
DFI 2009JJA Construction - Shaft 3W South Load Test - October 2009
Huey P. Long Bridge Drilled Shafts - October 2009JJA Construction - Pier 2W - September 2009 Photos
Univ Kansas Research - Lateral Load Test on Drilled ShaftsHuey P. Long Bridge, New Orleans - Test Shaft Construction - July 16-19, 2009
GIWW West Closure Complex Test Piles June and July 2009Garden State Parkway Mullica River Bridge - Test Shaft Construction - June 2009