Get the New FHWA Drilled Shaft Manual

Get the NCHRP Synthesis 418 – Pile Criteria From Test Pile Data

Dan’s Speaking Schedule

September 12-13, 2012: Concrete used in Drilled Shaft Construction - ADSC/DFI Drilled Shaft Seminar - Denver, Colorado

October 26, 2012: Factors Affecting the Selection and Use of Drilled Shafts for Transportation Infrastructure Projects - 26th Central Pennsylvania Geotechnical Conference - ASCE/DFI - Hershey, Pennsylvania

Other DBA Team Speaking Appearances

John Turner (September 12-13, 2012): Analysis & Design of Drilled Shafts - ADSC/DFI Drilled Shaft Seminar - Denver, Colorado

John Turner (September 12-13, 2012): Techniques for Drilled Shaft Construction - ADSC/DFI Drilled Shaft Seminar - Denver, Colorado

Conferences, Meetings, Seminars, Workshops

Tim Siegel, P.E. joins DBA!

09_tim

 

 

DBA is growing again with the addition of Tim Siegel, P.E. to our team! 

Tim has been primarily involved in the analysis and design of geotechnical structures including drilled shafts, cast-in-place piles, micropiles, and earth retention systems.  Tim is a Georgia Tech grad (like Dan!) and has worked most of his career since at S&ME and Berkel & Company Contractors, Inc. During his 12 years with S&ME, he advanced from Geotechnical Engineer to Technical Principal and Chief Engineer while developing expertise in construction in karst, seismic design, numerical modeling, and specialty foundations and retaining systems.  After leaving S&ME, he was a Senior Geotechnical Engineer with Berkel and was involved in large deep foundation projects all over the United States. While at Berkel, he led the development of the ground improvement technique using Berkel’s ground displacement technology. While at S&ME and then while at Berkel, he taught upper level and graduate level courses while on the faculty of the University of Tennessee.  Tim’s resume can be found in the About US section of our site.

We are really glad to have Tim joining us.  As you can see by his photo, he has the requisite hair style!

Archives

GeotechSearch.com

DBA Photo Albums

ADSC SE Drilled Shaft Research Project, Lawrenceville, GA Test SiteDBA Honors and Awards
JJA Pictures from Chris Ursery (FIGG)Hastings Bridge Construction
Ownesboro Hospital Ground ImprovementArtistic Construction - Vol 1
JJA Construction 2010LPV-145 Test Piles 2009-2010
DFI 2009JJA Construction - Shaft 3W South Load Test - October 2009
Huey P. Long Bridge Drilled Shafts - October 2009JJA Construction - Pier 2W - September 2009 Photos
Univ Kansas Research - Lateral Load Test on Drilled ShaftsHuey P. Long Bridge, New Orleans - Test Shaft Construction - July 16-19, 2009
GIWW West Closure Complex Test Piles June and July 2009Garden State Parkway Mullica River Bridge - Test Shaft Construction - June 2009