Get the New FHWA Drilled Shaft Manual

Get the NCHRP Synthesis 418 – Pile Criteria From Test Pile Data

Dan’s Speaking Schedule

September 12-13, 2012: Concrete used in Drilled Shaft Construction - ADSC/DFI Drilled Shaft Seminar - Denver, Colorado

October 26, 2012: Factors Affecting the Selection and Use of Drilled Shafts for Transportation Infrastructure Projects - 26th Central Pennsylvania Geotechnical Conference - ASCE/DFI - Hershey, Pennsylvania

Other DBA Team Speaking Appearances

John Turner (September 12-13, 2012): Analysis & Design of Drilled Shafts - ADSC/DFI Drilled Shaft Seminar - Denver, Colorado

John Turner (September 12-13, 2012): Techniques for Drilled Shaft Construction - ADSC/DFI Drilled Shaft Seminar - Denver, Colorado

Conferences, Meetings, Seminars, Workshops

DBA On Team for Hurricane Deck Bridge Replacement

images

(Image source: LakeExpo.com)

DBA is part of a team led by Parsons Transportation Group that was selected to design the replacement of the Hurricane Deck Bridge over The Lake of the Ozarks in Camden County Missouri.  MoDOT has awarded the design contract to Parsons. DBA will be the lead geotechnical engineer with Terracon on the team providing drilling and laboratory services, as well as some foundation engineering support services.  Parsons was chosen due to the innovative approach the team proposed that includes reusing the existing piers (from ENR.com):

MoDOT chose Parsons for proposing an innovative approach to construction that involves the use of temporary pier widening and shifting the existing superstructure over. This method will allow traffic to be maintained on the existing bridge while the new bridge is constructed, potentially resulting in significant cost savings.

A little history of the bridge can be found at Go2Lakeofthe Ozarks.com, including how it got its name: 

Hurricane Deck Bridge of Ozarks crosses the main channel of the lake of approximately mile marker 35. It carries Missouri highway 5 between Versailles and Camdenton. It was built in 1936 –five years after the lake filled. It was named as Hurricane Deck because it was heard that a tornado struck that area which was locally "Hurricanes". It is a nautical term associated with river steamboats. The Hurricane Deck was the uppermost deck which provides and allows everyone to experience the pleasant breezy place and the passing scenery.

Other news links:

Lake News Online – 12/2/2010

Lake Expo.com – 12/2/2010

Biloxi Bay Bridge Test Pile Program – DFI Journal Volume 3, May 2009

Robert’s paper with Lloyd Held (retired from Eustis Engineering) and Steve Saye of Kiewit Engineering Company on the Biloxi Bay Bridge test pile program has been published in the latest issue of the DFI Journal, published by the Deep Foundations Institute.  A total of 22 indicator piles were installed on the project using the pile driving analyzer to monitor the pile behavior. Five load tests were performed: two axial Statnamic, two lateral Statnamic, and one static axial. The results of the test pile program established driving criteria for production piles that included end of drive blow counts and pile tip elevations with an appropriate allowance for setup.

 

Click on the image below or go to our Publications page.

Test Pile Program to Determine Axial Capacity and Pile Setup for the Biloxi Bay Bridge_ThompsonHeldSaye - DFI Journal Vol3-May09

 

The bridge was recently featured on the cover of Civil Engineering Magazine along with a feature article by Pat Cassity, P.E., S.E. of Parsons Transportation Group.  Source: ASCE

0709Cover

Archives

GeotechSearch.com

DBA Photo Albums

ADSC SE Drilled Shaft Research Project, Lawrenceville, GA Test SiteDBA Honors and Awards
JJA Pictures from Chris Ursery (FIGG)Hastings Bridge Construction
Ownesboro Hospital Ground ImprovementArtistic Construction - Vol 1
JJA Construction 2010LPV-145 Test Piles 2009-2010
DFI 2009JJA Construction - Shaft 3W South Load Test - October 2009
Huey P. Long Bridge Drilled Shafts - October 2009JJA Construction - Pier 2W - September 2009 Photos
Univ Kansas Research - Lateral Load Test on Drilled ShaftsHuey P. Long Bridge, New Orleans - Test Shaft Construction - July 16-19, 2009
GIWW West Closure Complex Test Piles June and July 2009Garden State Parkway Mullica River Bridge - Test Shaft Construction - June 2009