Get the New FHWA Drilled Shaft Manual
Get the NCHRP Synthesis 418 – Pile Criteria From Test Pile Data
Dan’s Speaking Schedule September 12-13, 2012: Concrete used in Drilled Shaft Construction - ADSC/DFI Drilled Shaft Seminar - Denver, Colorado
Other DBA Team Speaking Appearances D. Mike Holloway (May 17, 2012): A Driven Pile is a Tested Pile - Not So Fast - DFI SuperPile - Portland, Oregon
John Turner (September 12-13, 2012): Analysis & Design of Drilled Shafts - ADSC/DFI Drilled Shaft Seminar - Denver, Colorado
John Turner (September 12-13, 2012): Techniques for Drilled Shaft Construction - ADSC/DFI Drilled Shaft Seminar - Denver, Colorado
Conferences, Meetings, Seminars, Workshops
|
By Robert Thompson, on August 10th, 2009

The May 2009 issue of Foundation Drilling had an article by Dan and Robert summarizing the recent research on drilled shafts socketed into rock for the Southeast Chapter of ADSC .
The article has been posted to our Publications Page. The full report is located here, for those looking for a little light reading.
A test site has been selected for Atlanta in the Piedmont formation. Check back here or at the project page for updates as things move forward.


|
|
|