Get the New FHWA Drilled Shaft Manual
Get the NCHRP Synthesis 418 – Pile Criteria From Test Pile Data
Dan’s Speaking Schedule September 12-13, 2012: Concrete used in Drilled Shaft Construction - ADSC/DFI Drilled Shaft Seminar - Denver, Colorado
October 26, 2012: Factors Affecting the Selection and Use of Drilled Shafts for Transportation Infrastructure Projects - 26th Central Pennsylvania Geotechnical Conference - ASCE/DFI - Hershey, Pennsylvania
Other DBA Team Speaking Appearances John Turner (September 12-13, 2012): Analysis & Design of Drilled Shafts - ADSC/DFI Drilled Shaft Seminar - Denver, Colorado
John Turner (September 12-13, 2012): Techniques for Drilled Shaft Construction - ADSC/DFI Drilled Shaft Seminar - Denver, Colorado
Conferences, Meetings, Seminars, Workshops
|
By Robert Thompson, on January 3rd, 2011
The kcICON project in Kansas City has been completed six months ahead of schedule and within budget with all lanes and ramps being open on December 18th. Demolition has begun on the existing Paseo bridge. You can see some photos of the demolition (like the one in this post – thanks kcICON!) at their Facebook page. It was a great experience for us to have been a part of this project. If you want to see all of our previous posts on this, click here. Other points of interest are linked below.
The Kansas City District of MoDOT
ENR
DBA Project Page
kcICON Facebook Page
kcICON web page
By Robert Thompson, on November 2nd, 2010
Paul received a few photos of the kcICON bridge that are just too cool not to share. These were sent to him by Massman Construction. These were taken in September of this year. MoDOT’s Flicker album of the dedication ceremony is here. The new bridge was dedicated and partially opened to traffic (southbound) on September 27th. The northbound traffic was shifted to the new structure on October 22nd. All of the bridges and ramps for the project will be opened by the end of the year – 6 months ahead of schedule. Can’t wait to see it after the exisitng bridge is demoloshed, though it is a pretty cool image with the old and new bridges together. Updates for the project are on the project Facebook Page.
Click here for previous posts on kcICON.



By Robert Thompson, on November 1st, 2010
Dan recently played the part of storyteller at the Southeastern Transportation Geotechnical Engineering Conference (STGEC) 2010 conference in Charleston, West Virginia when he gave the lunch presentation on the conference’s first day. He took the audience on a trip down the Mississippi River from a foundation engineer’s perspective, talking about several bridges that DBA has had the pleasure to work on, or is still working on, along the river the last few years. Dan began with the I-35W Bridge replacement in Minneapolis, Minnesota and ended at the Huey P. Long Bridge in New Orleans, Louisiana. Stops along the way included the Hastings Bridge (Hastings Minnesota), the new I-70 Bridge (St. Louis, Missouri), and the Audubon Bridge (New Roads/St. Francisville, Louisiana). Dan covered some of the technical issues/problems associated with each project and the solutions applied to complete the foundations (or complete the design). It was a very informative talk presented in a unique way that everyone at the luncheon seemed to enjoy. Dan’s presentation is now available on our Presentations Page.
Posts on Hastings Bridge here.
Posts on I-70 Bridge here.
Posts on Audubon Bridge here.
Posts on the Huey P. Long Bridge here.
Immediately after lunch, Robert made a presentation that described some of the pile load tests performed on two of the storm protection projects in New Orleans that DBA was privileged to be involved with through Kiewit. By following Dan, it provided a little continuity to the story as Robert took the group below the Huey P. Long Bridge to the levees and canals downstream of New Orleans. Robert’s presentation can also be found on our Presentations Page.
Post on the pile load tests here.
By Robert Thompson, on August 30th, 2010

The Lunda/Ames design-build joint venture (Lunda Construction Company of Black River Falls, Wisconsin and Ames Construction, Inc. of Burnsville, Minnesota) has been awarded a contract to build the new Highway 61 Hastings Bridge over the Mississippi River in Hastings, Minnesota. Parsons Transportation Group is the designer and DBA is performing geotechnical design of the bridge foundations and settlement mitigation as a sub-consultant to PTG.
Here is the existing bridge that is being replaced (viewing from upstream):

In addition to several relatively large approach spans, the new bridge will include a 545ft long free-standing arch main span with four lanes of traffic and a 12 foot wide common use pedestrian/bike path. The new bridge will allow additional parking and an artistic plaza area south of the river. An anti-icing system will be installed to help achieve the 100-year design life.
On the south side of the Mississippi River, the bridge foundations will consist of spread footings bearing on dolostone bedrock. The remaining bridge foundations will utilize 42in diameter pipe piles. Several Statnamic load tests, both axial and lateral, will be performed by our friends at AFT.
Settlement mitigation is required beneath the North Embankment due to several relatively thick and deep strata of compressible fine-grained soils. The embankment will also be heavily instrumented to evaluate performance of the embankment and mitigation technique.
Preliminary work including subsurface investigation has begun. The subsurface investigation is being performed by Braun Intertec under sub-contract to DBA. Test piles will be installed in early September, 2010 with subsequent load testing soon after.
The awarded design-build contract is for $120M. The estimated project completion date is May 13, 2013.
DBA Project Page here.

Mn/DOT Hastings Bridge Project Home Page
Here is a sampling of the local news on the project award:
Hastings Star-Gazette: Many articles, ongoing
9/22 Star Tribune: New Hastings Bridge is on the way
July 1 South Washington County Bulletin: Bridge design chosen: It will be the tied-arch
July 1 Minneapolis/St. Paul Business Journal: Lunda/Ames team wins $120M Hastings Bridge contract
By Robert Thompson, on August 18th, 2010
Check out the bottom of my post on June 30th World Record O-Cell Load Test for some updates and new links to recent news articles.
By Robert Thompson, on July 25th, 2010
Robert made a presentation at the recent Alabama Section ASCE 2010 Summer Meeting on our participation in some pile load tests on a couple of the storm protection projects in New Orleans (see previous post here). DBA worked for Kiewit Engineering Company (KECo) and the two joint ventures on the projects, providing geotechnical consulting. We are collaborating with KECo on a couple of papers (maybe more) that include the test data. This presentation covered the basics of the test pile programs, highlighted some of the results, discussed the measured setup values for the piles (driven in the soft Louisiana clays), and looked at some comparisons of the dynamic and static load test results to the pile resistance predictions made by DBA during the course of our work. Please note that the Corps of Engineers (and their consultants) were the design engineers. Our work was in support of the contractor joint ventures, especially evaluating pile drivability and installation issues.
Some of the photos included in the presentation were obtained from the public Flickr albums posted by Team New Orleans, U.S. Army Corps of Engineers. There are a lot of good photos there of many of the ongoing projects around New Orleans, as well as an album of historical photos.
You can check out several webcams at the West Closure project here.
You can see Robert’s presentation here.
UPDATE (11/1/10): I have replaced this presentation with a similar one presented at the STGEC 2010 conference in October. The link now directs to the more recent presentation.
By Robert Thompson, on July 7th, 2010
Although I have known for several weeks that the manual was finished (I work for one of the authors, after all!), I was waiting for the FHWA to post the link for the new manual before posting this…and now it is here! My friend, Randy Post, has an outside review (meaning not connected to one of the authors!) over at his blog Geoprac.net. Not only did he get “the scoop” on me, but he covers some of the highlights of the “what’s new” with the new, fully revised manual. The biggest change is completely re-writing the design sections to follow LRFD as well as to update the methods for calculating soil and rock resistance. As Randy also notes, the manual has been given a Geotechnical Engineering Circular (GEC) designation: GEC 10. Make sure and go read his review, as well as check out the other things on his blog (disclosure by Robert: I am an occasional contributor there).
The manual’s authors are three of the country’s top experts in drilled shaft design and construction: our own Dan A. Brown, Ph.D, P.E. , John P. Turner, Ph.D, P.E. of the University of Wyoming, and Raymond J. Castelli, P.E. of Parsons Brinckerhoff. As with any major FHWA publication such as this, there was significant industry involvement in the review process through various technical committees and individuals from ADSC, DFI, and Geo-Institute. A note from Dan:
The completion of this manual is a great relief and satisfaction. Many thanks to John Turner’s hard work and also for Ray Castelli’s diligent work to review and make us better. Special thanks to PB Project Manager Jeremy Hung and our FHWA sponsor Silas Nichols for their dedicated efforts to help get this done, and to all of you who contributed.
Dan and John have been using the material in the NHI course this fiscal year, having done some pilot courses the previous year. Some NHI courses, including the Drilled Shaft course, can be hosted by non-government groups. There are also some public seats available occasionally at DOT hosted courses. The NHI catalog page for this course is here.
Download Drilled Shafts:Construction Procedures and LRFD Design Methods, 2010.
Also linked on our Publications page.
Update (7/12/10): For those that prefer the feel of a printed volume in their hands, the ADSC: The International Association of Foundation Drilling will be the distributor of the printed volume of the manual through their Technical Library. It will be available soon, according to ADSC. We’ll post about it as soon as it is available.
Update 2 (8/19/10): The printed manual is now available.
By Robert Thompson, on May 28th, 2010
By Robert Thompson, on May 25th, 2010
As geotechnical/foundation engineers, we don’t usually get to see much of what happens on a project after the foundations are completed, especially a project like a large bridge that can take years to complete. Technology such as the Internet, webcams, and digital photography have made it easy for us to see how things are progressing on projects, as well as maybe get images of the completed structure. As I have noted before, some projects are using Twitter and Facebook to keep the public informed on closures, delays or overall project progress as part of good public relations. Her are some updates on a few of our recent projects.
kcICON:
The main span is well underway, including the cables. The kcICON Facebook page is here.

Audubon Bridge:
Check out the webcam. You can download images if you like. YOu can also do a time-lapse from Day 1 of construction.
Beck Street Bridge:
Part of the I-15 Express Link project in Salt Lake City, UT. The photos below I obtained from the photos page on the project web site. We were involved in the design and construction of the foundations for the Beck Street Bridge only.
 
By Robert Thompson, on May 12th, 2010
The Professor Ralph Peck Legacy Website has been launched by Geoengineer.org:
Geoengineer.org is pleased to announce the launch of "Professor Ralph Peck’s Legacy Website". The Website has been developed to celebrate the life and legacy of one of the Heroes of the geotechnical engineering field and honor a distinguished geotechnical engineer for his dedication and contributions to the society as a teacher, author, and engineer. The Website includes a lot of resources such as biographical data, quotes, photos, powerpoints, and even videos of lectures by Professor Peck. The Shamsher Prakash Foundation has generously sponsored this activity. The website has been developed in collaboration with Mrs. Nancy Peck-Young, Prof. Peck’s daughter and was supervised by an international Advisory Committee of distinguished members of our community that had the luxury of knowing Prof. Peck and consists of Prof. Dobry, Prof. Cording, Prof. Prakash and Dr. Lacasse. The content of the website is divided in three parts: "About his life", "Publications" and "Resources". We hope that this resource will be a source of inspiration for the future generations of geotechnical engineers. We also encourage you to provide us with any additional resources/content and we will be glad to include it in the website’s content.
Such a website is a fitting tribute to such an icon in the geotechnical engineering and construction industry. Make sure and check it out. I have added a link on our sidebar in the Geotechnical Resources section.
|
|
|