Get the New FHWA Drilled Shaft Manual
Get the NCHRP Synthesis 418 – Pile Criteria From Test Pile Data
Dan’s Speaking Schedule September 12-13, 2012: Concrete used in Drilled Shaft Construction - ADSC/DFI Drilled Shaft Seminar - Denver, Colorado
Other DBA Team Speaking Appearances D. Mike Holloway (May 17, 2012): A Driven Pile is a Tested Pile - Not So Fast - DFI SuperPile - Portland, Oregon
John Turner (September 12-13, 2012): Analysis & Design of Drilled Shafts - ADSC/DFI Drilled Shaft Seminar - Denver, Colorado
John Turner (September 12-13, 2012): Techniques for Drilled Shaft Construction - ADSC/DFI Drilled Shaft Seminar - Denver, Colorado
Conferences, Meetings, Seminars, Workshops
|
By Robert Thompson, on May 5th, 2009
 Main Pylon under construction for Bond Bridge, Kansas City, MO
Work by DBA is all but compete on the kcICON project. All drilled shafts have been installed and base grouted. Construction of the shafts went very well, with no significant issues. Hayes Drilling installed all of the land-based shafts. AFT performed all of the base grouting.
The main pylon in the river continues to take shape. It won’t be long before PCC will have it looking like a bridge!
Paul has been “enjoying” observing drilled shafts at night and base grouting during the day. A collection of some of his photos from the last bits of shaft construction are below. He got some great shots of the pylon, including some out in the river.
More pictures here.
Previous post here.
|
|
|