Get the New FHWA Drilled Shaft Manual

Get the NCHRP Synthesis 418 – Pile Criteria From Test Pile Data

Dan’s Speaking Schedule

March 16, 2012 - "Advanced" Design and Construction Issues with Drilled Shaft Foundations; Case Histories - ADSC Equipment EXPO and Technical Conference - San Antonio, Texas

March 26-28, 2012 - State of the Art and Practice for Drilled Foundations - GeoCongress 2012 - ASCE/Geo-Institute - San Francisco, California

Other DBA Team Speaking Appearences

Tim Siegel (January 22, 2012): Innovative Techniques for Characterizing Karst Terrain, Workshop on Geo-innovation in Subsurface Exploration, TRB Annual Meeting, Washington, D.C.

John Turner and Robert Thompson (February 21-23, 2012): NHI Drilled Shaft Course - Kansas DOT, Topeka, Kansas

Robert Thompson (February 24, 2012): Conservatism in Drilled Shaft Design When Utilizing Rock Sockets, Alabama Transportation Conference, Montgomery, Alabama

Tim Siegel (March 15, 2012): Micropile Design Installation and Performance for the Foothills Parkway, ADSC Equipment EXPO and Technical Conference, San Antonio, Texas

Robert Thompson (March 15, 2012): Full-Scale Load Tests on Drilled Shafts in Tennessee and Georgia, ADSC Equipment EXPO and Technical Conference, San Antonio, Texas

Erik Loehr (March 15, 2012): Slope Stabilization Using Micropiles, ADSC Equipment EXPO and Technical Conference, San Antonio, Texas

TBA (April 10-12, 2012): NHI Drilled Shaft Course - South Carolina DOT, Columbia, South Carolina

Conferences, Meetings, Seminars, Workshops

Driven Piles for New Orleans Levee Projects – Wrap Up

Our support of Kiewit Engineering and two Kiewit joint ventures working on the flood control projects around New Orleans has completed.  I posted on the support work we provided for the Gulf Intracoastal Waterway – West Closure Project here.  The JV for that project is Gulf Intracoastal Constructors (GIC), a joint venture of Kiewit and Traylor Brothers.

Another project we worked on is the Chalmette Levee Loop Improvements LPV-145 project.  The joint venture for this project is Chalmette Levee Constructors (CLC), a joint venture of Kiewit, Massman, and Traylor Brothers.  Some information about the project can be found at Traylor Brothers website here.  This project consists of building over 5 miles of T-wall on the levee.  A test pile program with piles at 4 tests sites was completed, including static and dynamic tests on H-piles and open-ended pipe piles.  Dynamic, static compression, and static tension tests were performed at 3 of the 4 sites.  One site had only dynamic tests during driving.  Our newest staff engineer, Aaron Hudson begin_of_the_skype_highlighting     end_of_the_skype_highlighting, started his tenure at DBA by heading to New Orleans to help me with our work on this project.

During the test pile program, the project location was accessible only by boat.  A temporary bridge has been constructed over Bayou Bienvenue to provide better access.  The bridge is a pre-engineered bridge kit similar to the Bailey Bridge sets used by the U.S. Army starting in WWII, and still in use today by the Army and the private sector all over the world.  I had some experience as an Army Engineer officer planning and executing the assembly and launch of Bailey Bridges.  In the Army labor is plentiful, so there are not near as many cranes and other equipment available when assembling a bridge kit as there are on a modern construction site.  Compare this photo from a training exercise near Fort Polk, Louisiana in 1989 (from my Army days) with one in our show below and at the website of the current Bailey Bridge manufacturer.

 

bailey bridge

 

I have posted some photos from our visits there to our Picassa Albums (linked below).  There are pictures of the test piles and the temporary bridge.  Also included are some photos I took of the Inner Harbor Navigation Canal Barrier project.  This project is amazing with 66-inch diameter cylinder piles and 18” pre-stressed concrete piles making up the bulk of the structure. Project photos at the Corps of Engineers site are here.

 

Update 7/25/10: Webcams of the West Closure Project are here.  The Corps’ Team New Orleans has a Flickr page here with lots of great photos.

 

 

2 comments to Driven Piles for New Orleans Levee Projects – Wrap Up

Leave a Reply

 

 

 

You can use these HTML tags

<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

Archives

GeotechSearch.com

DBA Photo Albums

ADSC SE Drilled Shaft Research Project, Lawrenceville, GA Test SiteDBA Honors and Awards
JJA Pictures from Chris Ursery (FIGG)Hastings Bridge Construction
Ownesboro Hospital Ground ImprovementArtistic Construction - Vol 1
JJA Construction 2010LPV-145 Test Piles 2009-2010
DFI 2009JJA Construction - Shaft 3W South Load Test - October 2009
Huey P. Long Bridge Drilled Shafts - October 2009JJA Construction - Pier 2W - September 2009 Photos
Univ Kansas Research - Lateral Load Test on Drilled ShaftsHuey P. Long Bridge, New Orleans - Test Shaft Construction - July 16-19, 2009
GIWW West Closure Complex Test Piles June and July 2009Garden State Parkway Mullica River Bridge - Test Shaft Construction - June 2009