Get the New FHWA Drilled Shaft Manual

Dan’s Speaking Schedule

September 21-23, 2010 - NHI Drilled Shaft Course, Iowa

October 5-6, 2010 - 42nd STGEC, Charleston, West Virginia

October 14-15, 2010 - DFI 35th Conference on Deep Foundations, Hollywood, California

October 19-21, 2010 - - NHI Drilled Shaft Course, Iowa

November 10, 2010 - ADSC Drilled Shaft Seminar, New York, New York

December 1-2, 2010 - TRB 27th Bridge Conference, San Antonio, Texas

Other DBA Team Speaking Appearences

Tim Siegel (Sept 30-Oct 1, 2010): North Carolina ASCE Section Annual Meeting, Asheville, NC

Robert Thompson (October 5-6, 2010):42nd STGEC, Charleston, West Virginia

Tim Siegel (October 29, 2010): Deep Foundation Design - Axial Capacity, Settlement, and Lateral Resistance, Norfolk, Virginia

Tim Siegel (December 16, 2010): Shallow Foundation Design, Atlanta, Georgia

Steve Dapp (January 11, 2011): 2011 Louisiana Transportation Conference, Baton Rouge, Louisiana

Conferences, Meetings, Seminars, Workshops

Foundation Work is Finished at Audubon Bridge!!!

Yes, you read that right – the last drilled shaft has been installed on the John James Audubon Bridge near New Road, Louisiana.  The project has been quite an adventure for us, especially Steve.  He spent the most time on the site during shaft excavation, tip grouting, load testing, and even pile driving.  Robert got to spend a fair amount of time, too, over the last couple of years.  Paul was even lucky enough to make a couple of trips.

The shaft construction was concluded with one last O-cell test on Shaft 3W South.  Dan was present for the last load test which went fabulously well.

If you are going to the Geo-Institute congress GeoForida 2010 next February in West Palm Beach, you can hear Steve present the paper he and Dan wrote on the tip grouting and load test program.

The bridge is still under construction, of course, and will be an awesome structure when completed.  It was an exciting project for us to be a part of the team.  We’ll have a project summary posted in the near future to highlight the details of the foundations.  For now, you will have to be satisfied with the slideshows below (in reverse chronological order) from some of our visits this summer and fall.

Load Test at Shaft 3W South – October 2009

Excavation of Shaft 3W South – September 2009

Shaft Grouting and other Construction – June 2009

Shaft Excavation, Pile Driving, and Cofferdams – May 2009

Leave a Reply

 

 

 

You can use these HTML tags

<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

Archives

GeotechSearch.com

DBA Photo Albums

Artistic Construction - Vol 1JJA Construction 2010
LPV-145 Test Piles 2009-2010DFI 2009
JJA Construction - Shaft 3W South Load Test - October 2009Huey P. Long Bridge Drilled Shafts - October 2009
JJA Construction - Pier 2W - September 2009 PhotosUniv Kansas Research - Lateral Load Test on Drilled Shafts
Huey P. Long Bridge, New Orleans - Test Shaft Construction - July 16-19, 2009GIWW West Closure Complex Test Piles June and July 2009
Garden State Parkway Mullica River Bridge - Test Shaft Construction - June 2009JJA Construction - Base Grouting and Other Construction - June 2009
JJA Construction - Shaft Excavation, PIle Driving, and Cofferdams - May 2009JJA Construction - East Pier and East High Approach - April 2009
KcICON River Bridge - Bent 1, Bent 5, and Pylon - March 2009JJA Construction - West Pier and West High Approach Shafts - April 2009