Get the New FHWA Drilled Shaft Manual
Get the NCHRP Synthesis 418 – Pile Criteria From Test Pile Data
Dan’s Speaking Schedule March 16, 2012 - "Advanced" Design and Construction Issues with Drilled Shaft Foundations; Case Histories - ADSC Equipment EXPO and Technical Conference - San Antonio, Texas
March 26-28, 2012 - State of the Art and Practice for Drilled Foundations - GeoCongress 2012 - ASCE/Geo-Institute - San Francisco, California
Other DBA Team Speaking Appearences Tim Siegel (January 22, 2012): Innovative Techniques for Characterizing Karst Terrain, Workshop on Geo-innovation in Subsurface Exploration, TRB Annual Meeting, Washington, D.C.
John Turner and Robert Thompson (February 21-23, 2012): NHI Drilled Shaft Course - Kansas DOT, Topeka, Kansas
Robert Thompson (February 24, 2012): Conservatism in Drilled Shaft Design When
Utilizing Rock Sockets, Alabama Transportation Conference, Montgomery, Alabama
Tim Siegel (March 15, 2012): Micropile Design Installation and Performance for the Foothills Parkway, ADSC Equipment EXPO and Technical Conference, San Antonio, Texas
Robert Thompson (March 15, 2012): Full-Scale Load Tests on Drilled Shafts in Tennessee and Georgia, ADSC Equipment EXPO and Technical Conference, San Antonio, Texas
Erik Loehr (March 15, 2012): Slope Stabilization Using Micropiles, ADSC Equipment EXPO and Technical Conference, San Antonio, Texas
TBA (April 10-12, 2012): NHI Drilled Shaft Course - South Carolina DOT, Columbia, South Carolina
Conferences, Meetings, Seminars, Workshops
|
Recent Project Photos – (or) What have we been up to the last few months (Part 2)?……Driven Piles!
By Robert Thompson, on October 30th, 2009
Who says we only work on drilled shafts?? Robert had the opportunity to work for Kiewit Engineering Company providing geotechnical engineering support to Gulf Intracoastal Constructors (GIC), a joint venture of Kiewit and Traylor Brothers on the Gulf Intracoastal Waterway West Closure Project near Belle Chase, Louisiana. The project is part of the overall flood protection system improvements that are supposed to protect New Orleans from future hurricanes. The key components of this particular project are a massive gate and pump station across the Gulf Intracoastal Waterway. Go For more information on the project, go here, here, and here (video from Corps of Engineers).
Robert spent a good part of the summer in New Orleans doing a variety of geotechnical engineering tasks to support the construction efforts of GIC. The main thing he worked on was the test pile program. The project included a massive test pile program with 24 test piles spread among 5 test sites with various combinations of dynamic, static axial, static tension, and static lateral tests. The piles were mostly open-ended steel pipe piles varying from 18” to 54” in diameter. A few 18” x 18” pre-stressed precast concrete piles were also thrown in for good measure. In addition to performing drivability studies and evaluating tests data, Robert got to spend some time in the wonderful June and July weather in southern Louisiana on the site observing pile installation and testing. And as always, he came back with a lot of pictures. Here are a few to enjoy.
|
|
|
[...] on the support work we provided for the Gulf Intracoastal Waterway – West Closure Project here. The JV for that project is Gulf Intracoastal Constructors (GIC), a joint venture of Kiewit [...]