Get the New FHWA Drilled Shaft Manual

Dan’s Speaking Schedule

September 21-23, 2010 - NHI Drilled Shaft Course, Iowa

October 5-6, 2010 - 42nd STGEC, Charleston, West Virginia

October 14-15, 2010 - DFI 35th Conference on Deep Foundations, Hollywood, California

October 19-21, 2010 - - NHI Drilled Shaft Course, Iowa

November 10, 2010 - ADSC Drilled Shaft Seminar, New York, New York

December 1-2, 2010 - TRB 27th Bridge Conference, San Antonio, Texas

Other DBA Team Speaking Appearences

Tim Siegel (Sept 30-Oct 1, 2010): North Carolina ASCE Section Annual Meeting, Asheville, NC

Robert Thompson (October 5-6, 2010):42nd STGEC, Charleston, West Virginia

Tim Siegel (October 29, 2010): Deep Foundation Design - Axial Capacity, Settlement, and Lateral Resistance, Norfolk, Virginia

Tim Siegel (December 16, 2010): Shallow Foundation Design, Atlanta, Georgia

Steve Dapp (January 11, 2011): 2011 Louisiana Transportation Conference, Baton Rouge, Louisiana

Conferences, Meetings, Seminars, Workshops

Recent Project Photos – (or) What have we been up to the last few months (Part 2)?……Driven Piles!

Who says we only work on drilled shafts??  Robert had the opportunity to work for Kiewit Engineering Company providing geotechnical engineering support to Gulf Intracoastal Constructors (GIC), a joint venture of Kiewit and Traylor Brothers on the  Gulf Intracoastal Waterway West Closure Project near Belle Chase, Louisiana.  The project is part of the overall flood protection system improvements that are supposed to protect New Orleans from future hurricanes.  The key components of this particular project are a massive gate and pump station across the Gulf Intracoastal Waterway.  Go For more information on the project, go here, here, and here (video from Corps of Engineers).

Robert spent a good part of the summer in New Orleans doing a variety of geotechnical engineering tasks to support the construction efforts of GIC.  The main thing he worked on was the test pile program.  The project included a massive test pile program with 24 test piles spread among 5 test sites with various combinations of dynamic, static axial, static tension, and static lateral tests.  The piles were mostly open-ended steel pipe piles varying from 18” to 54” in diameter.  A few 18” x 18” pre-stressed precast concrete piles were also thrown in for good measure.   In addition to performing drivability studies and evaluating tests data, Robert got to spend some time in the wonderful June and July weather in southern Louisiana on the site observing pile installation and testing.  And as always, he came back with a lot of pictures.  Here are a few to enjoy.

1 comment to Recent Project Photos – (or) What have we been up to the last few months (Part 2)?……Driven Piles!

Leave a Reply

 

 

 

You can use these HTML tags

<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

Archives

GeotechSearch.com

DBA Photo Albums

Artistic Construction - Vol 1JJA Construction 2010
LPV-145 Test Piles 2009-2010DFI 2009
JJA Construction - Shaft 3W South Load Test - October 2009Huey P. Long Bridge Drilled Shafts - October 2009
JJA Construction - Pier 2W - September 2009 PhotosUniv Kansas Research - Lateral Load Test on Drilled Shafts
Huey P. Long Bridge, New Orleans - Test Shaft Construction - July 16-19, 2009GIWW West Closure Complex Test Piles June and July 2009
Garden State Parkway Mullica River Bridge - Test Shaft Construction - June 2009JJA Construction - Base Grouting and Other Construction - June 2009
JJA Construction - Shaft Excavation, PIle Driving, and Cofferdams - May 2009JJA Construction - East Pier and East High Approach - April 2009
KcICON River Bridge - Bent 1, Bent 5, and Pylon - March 2009JJA Construction - West Pier and West High Approach Shafts - April 2009