Get the New FHWA Drilled Shaft Manual

Get the NCHRP Synthesis 418 – Pile Criteria From Test Pile Data

Dan’s Speaking Schedule

September 12-13, 2012: Concrete used in Drilled Shaft Construction - ADSC/DFI Drilled Shaft Seminar - Denver, Colorado

October 26, 2012: Factors Affecting the Selection and Use of Drilled Shafts for Transportation Infrastructure Projects - 26th Central Pennsylvania Geotechnical Conference - ASCE/DFI - Hershey, Pennsylvania

Other DBA Team Speaking Appearances

John Turner (September 12-13, 2012): Analysis & Design of Drilled Shafts - ADSC/DFI Drilled Shaft Seminar - Denver, Colorado

John Turner (September 12-13, 2012): Techniques for Drilled Shaft Construction - ADSC/DFI Drilled Shaft Seminar - Denver, Colorado

Conferences, Meetings, Seminars, Workshops

Recent Project Photos – (or) What have we been up to the last few months (Part 2)?……Driven Piles!

Who says we only work on drilled shafts??  Robert had the opportunity to work for Kiewit Engineering Company providing geotechnical engineering support to Gulf Intracoastal Constructors (GIC), a joint venture of Kiewit and Traylor Brothers on the  Gulf Intracoastal Waterway West Closure Project near Belle Chase, Louisiana.  The project is part of the overall flood protection system improvements that are supposed to protect New Orleans from future hurricanes.  The key components of this particular project are a massive gate and pump station across the Gulf Intracoastal Waterway.  Go For more information on the project, go here, here, and here (video from Corps of Engineers).

Robert spent a good part of the summer in New Orleans doing a variety of geotechnical engineering tasks to support the construction efforts of GIC.  The main thing he worked on was the test pile program.  The project included a massive test pile program with 24 test piles spread among 5 test sites with various combinations of dynamic, static axial, static tension, and static lateral tests.  The piles were mostly open-ended steel pipe piles varying from 18” to 54” in diameter.  A few 18” x 18” pre-stressed precast concrete piles were also thrown in for good measure.   In addition to performing drivability studies and evaluating tests data, Robert got to spend some time in the wonderful June and July weather in southern Louisiana on the site observing pile installation and testing.  And as always, he came back with a lot of pictures.  Here are a few to enjoy.

1 comment to Recent Project Photos – (or) What have we been up to the last few months (Part 2)?……Driven Piles!

Archives

GeotechSearch.com

DBA Photo Albums

ADSC SE Drilled Shaft Research Project, Lawrenceville, GA Test SiteDBA Honors and Awards
JJA Pictures from Chris Ursery (FIGG)Hastings Bridge Construction
Ownesboro Hospital Ground ImprovementArtistic Construction - Vol 1
JJA Construction 2010LPV-145 Test Piles 2009-2010
DFI 2009JJA Construction - Shaft 3W South Load Test - October 2009
Huey P. Long Bridge Drilled Shafts - October 2009JJA Construction - Pier 2W - September 2009 Photos
Univ Kansas Research - Lateral Load Test on Drilled ShaftsHuey P. Long Bridge, New Orleans - Test Shaft Construction - July 16-19, 2009
GIWW West Closure Complex Test Piles June and July 2009Garden State Parkway Mullica River Bridge - Test Shaft Construction - June 2009