Get the New FHWA Drilled Shaft Manual

Dan’s Speaking Schedule

September 21-23, 2010 - NHI Drilled Shaft Course, Iowa

October 5-6, 2010 - 42nd STGEC, Charleston, West Virginia

October 14-15, 2010 - DFI 35th Conference on Deep Foundations, Hollywood, California

October 19-21, 2010 - - NHI Drilled Shaft Course, Iowa

November 10, 2010 - ADSC Drilled Shaft Seminar, New York, New York

December 1-2, 2010 - TRB 27th Bridge Conference, San Antonio, Texas

Other DBA Team Speaking Appearences

Tim Siegel (Sept 30-Oct 1, 2010): North Carolina ASCE Section Annual Meeting, Asheville, NC

Robert Thompson (October 5-6, 2010):42nd STGEC, Charleston, West Virginia

Tim Siegel (October 29, 2010): Deep Foundation Design - Axial Capacity, Settlement, and Lateral Resistance, Norfolk, Virginia

Tim Siegel (December 16, 2010): Shallow Foundation Design, Atlanta, Georgia

Steve Dapp (January 11, 2011): 2011 Louisiana Transportation Conference, Baton Rouge, Louisiana

Conferences, Meetings, Seminars, Workshops

Recent Project Photos – (or) What have we been up to the last few months (Part 1)?…… Drilled Shafts!

If you frequent this blog, you have noticed that posts have been rare the last few months.  That is mostly to my being in the field a lot this summer and very busy on lost of projects.  While that is good, it meant I did not have time for updates.  Below are some slide shows from a few drilled shaft projects we worked on this summer.

 

Garden State Parkway Mullica River Bridge, New Jersey – Test Shaft Installation

Paul took a trip to lovely New Jersey to observe a large diameter test shaft on the Mullica River Bridge.  DBA worked as a consultant for Parsons Brinckerhoff on an 8-foot diameter, 220-foot deep test shaft.  CASE was the drilled shaft contractor and Agate was the general contractor.  DBA consulted on the design of the test shaft program, as well as the use of Self Consolidating Concrete (SCC).

 

 

Drilled Shaft Lateral Load Test Research with the University of Kansas

Paul took a ride out west to Kansas City, Kansas (close to home!) to observe a drilled shaft lateral load test in Wyandotte County, near the Cabela’s store on I-435.  The test is part of ongoing research by the University of Kansas for the Kansas DOT.   DBA was involved in previous research concerning laterally loaded shafts behind MSE walls (see previous post, click here for more information on the project).  This research continues on the same theme of investigating the behavior of laterally loaded shafts socketed into the sedimentary rocks in eastern Kansas.  DBA does not have an active role in this project, just an academic interest. 

 

 

 

Huey P. Long Bridge Improvements, New Orleans, Louisiana – Test Shaft Installation

The Huey P. Long Bridge in New Orleans (built in the 1930s) is undergoing a major rehab and expansion.  The vehicle traffic will increase from 2 9-foot lanes in each direction to 3 11-foot lanes in each direction.  This is a very interesting combined highway and railroad bridge with a fascinating history.  The bridge is actually a private bridge owned by the New Orleans Public Belt Railway (click the link to see some cool photos from the construction of the bridge in the 1930s). The project website is here. 

DBA was consulting with the joint venture building the bridge for the base-grouted drilled shafts under one new pier.  A test-shaft was built and tested with O-cells.  Robert was on site while they excavated the test shaft.  Steve was on site during grouting.

Leave a Reply

 

 

 

You can use these HTML tags

<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

Archives

GeotechSearch.com

DBA Photo Albums

Artistic Construction - Vol 1JJA Construction 2010
LPV-145 Test Piles 2009-2010DFI 2009
JJA Construction - Shaft 3W South Load Test - October 2009Huey P. Long Bridge Drilled Shafts - October 2009
JJA Construction - Pier 2W - September 2009 PhotosUniv Kansas Research - Lateral Load Test on Drilled Shafts
Huey P. Long Bridge, New Orleans - Test Shaft Construction - July 16-19, 2009GIWW West Closure Complex Test Piles June and July 2009
Garden State Parkway Mullica River Bridge - Test Shaft Construction - June 2009JJA Construction - Base Grouting and Other Construction - June 2009
JJA Construction - Shaft Excavation, PIle Driving, and Cofferdams - May 2009JJA Construction - East Pier and East High Approach - April 2009
KcICON River Bridge - Bent 1, Bent 5, and Pylon - March 2009JJA Construction - West Pier and West High Approach Shafts - April 2009