Get the New FHWA Drilled Shaft Manual

Get the NCHRP Synthesis 418 – Pile Criteria From Test Pile Data

Dan’s Speaking Schedule

March 16, 2012 - "Advanced" Design and Construction Issues with Drilled Shaft Foundations; Case Histories - ADSC Equipment EXPO and Technical Conference - San Antonio, Texas

March 26-28, 2012 - State of the Art and Practice for Drilled Foundations - GeoCongress 2012 - ASCE/Geo-Institute - San Francisco, California

Other DBA Team Speaking Appearences

Tim Siegel (January 22, 2012): Innovative Techniques for Characterizing Karst Terrain, Workshop on Geo-innovation in Subsurface Exploration, TRB Annual Meeting, Washington, D.C.

John Turner and Robert Thompson (February 21-23, 2012): NHI Drilled Shaft Course - Kansas DOT, Topeka, Kansas

Robert Thompson (February 24, 2012): Conservatism in Drilled Shaft Design When Utilizing Rock Sockets, Alabama Transportation Conference, Montgomery, Alabama

Tim Siegel (March 15, 2012): Micropile Design Installation and Performance for the Foothills Parkway, ADSC Equipment EXPO and Technical Conference, San Antonio, Texas

Robert Thompson (March 15, 2012): Full-Scale Load Tests on Drilled Shafts in Tennessee and Georgia, ADSC Equipment EXPO and Technical Conference, San Antonio, Texas

Erik Loehr (March 15, 2012): Slope Stabilization Using Micropiles, ADSC Equipment EXPO and Technical Conference, San Antonio, Texas

TBA (April 10-12, 2012): NHI Drilled Shaft Course - South Carolina DOT, Columbia, South Carolina

Conferences, Meetings, Seminars, Workshops

Audubon (JJA) Bridge Construction Update

I have been too busy to post more photos from my trips to New Roads, LA in the fall to help Steve with the work at the Audubon Bridge project.  It has been a flurry of activity as they worked to finish installing, tip-routing, and load testing all of the shafts in the river (done in December!).   They have also completed and tested the land test shaft on the west side of the river and begun installing the land shafts.  Throw in a lot of pile driving, including some 5-foot diameter pipe piles for temporary bents, and it has been a very busy site.  All of the various tip-grouting, O-cell load tests on drilled shafts, and PDA testing of the pre-cast piles has been successful.  As of today, the Mississippi River has come up and slowed things down a bit, but they should get all of the foundation completed within the next couple of months. 

Some pictures I took on some of my trips are setup below.  I have also experimented with embedding some video I took with my camera.  The camera was not set on a very high video capture resolution, but I think they are good enough for you to get the idea of the shaft excavation and the pile driving activities.

More pictures here.

Previous posts here.

 

East Pier Construction – September 2008:

 

East Temporary Bent Pile Driving – September 2008:

 

West Side Construction and Other Stuff – October 2008:

 

 

Excavating Shaft 5E with airlift.

 

 

Driving 5′ dia. pipe pile for East Temprary Bent

 

Extracting casing at Shaft 21W

Comments are closed.

Archives

GeotechSearch.com

DBA Photo Albums

ADSC SE Drilled Shaft Research Project, Lawrenceville, GA Test SiteDBA Honors and Awards
JJA Pictures from Chris Ursery (FIGG)Hastings Bridge Construction
Ownesboro Hospital Ground ImprovementArtistic Construction - Vol 1
JJA Construction 2010LPV-145 Test Piles 2009-2010
DFI 2009JJA Construction - Shaft 3W South Load Test - October 2009
Huey P. Long Bridge Drilled Shafts - October 2009JJA Construction - Pier 2W - September 2009 Photos
Univ Kansas Research - Lateral Load Test on Drilled ShaftsHuey P. Long Bridge, New Orleans - Test Shaft Construction - July 16-19, 2009
GIWW West Closure Complex Test Piles June and July 2009Garden State Parkway Mullica River Bridge - Test Shaft Construction - June 2009