Get the New FHWA Drilled Shaft Manual
Dan’s Speaking Schedule September 21-23, 2010 - NHI Drilled Shaft Course, Iowa
October 5-6, 2010 - 42nd STGEC, Charleston, West Virginia
October 14-15, 2010 - DFI 35th Conference on Deep Foundations, Hollywood, California
October 19-21, 2010 - - NHI Drilled Shaft Course, Iowa
November 10, 2010 - ADSC Drilled Shaft Seminar, New York, New York
December 1-2, 2010 - TRB 27th Bridge Conference, San Antonio, Texas
Other DBA Team Speaking Appearences Tim Siegel (Sept 30-Oct 1, 2010): North Carolina ASCE Section Annual Meeting, Asheville, NC
Robert Thompson (October 5-6, 2010):42nd STGEC, Charleston, West Virginia
Tim Siegel (October 29, 2010): Deep Foundation Design - Axial Capacity, Settlement, and Lateral Resistance, Norfolk, Virginia
Tim Siegel (December 16, 2010): Shallow Foundation Design, Atlanta, Georgia
Steve Dapp (January 11, 2011): 2011 Louisiana Transportation Conference, Baton Rouge, Louisiana
Conferences, Meetings, Seminars, Workshops
|
kcICON River Bridge Update
By Robert Thompson, on August 28th, 2008
Work is well underway on the main pylon foundation for the Christopher S. Bond Bridge on the kcICON project in Kansas City. By Labor Day, 4 of the 8 shafts (with 10.5-foot diameter rock sockets) will be completed. Construction of the shafts is progressing smoothly. The Pylon shafts may be completed as early as the end of September. Work on the land shafts will start sometime after Labor Day.
The photos in the slide show below were provided courtesy of the Missouri Department of Transportation (MoDOT).
Update: MoDOT has set up a webcam on the exisiting bridge looking down on the pylon construction. Check it out here.
Technorati : Bridge Foundations, Deep Foundations, Drilled Shafts, Foundation Construction, Foundations, Geotechnical Engineering