Get the New FHWA Drilled Shaft Manual

Dan’s Speaking Schedule

September 21-23, 2010 - NHI Drilled Shaft Course, Iowa

October 5-6, 2010 - 42nd STGEC, Charleston, West Virginia

October 14-15, 2010 - DFI 35th Conference on Deep Foundations, Hollywood, California

October 19-21, 2010 - - NHI Drilled Shaft Course, Iowa

November 10, 2010 - ADSC Drilled Shaft Seminar, New York, New York

December 1-2, 2010 - TRB 27th Bridge Conference, San Antonio, Texas

Other DBA Team Speaking Appearences

Tim Siegel (Sept 30-Oct 1, 2010): North Carolina ASCE Section Annual Meeting, Asheville, NC

Robert Thompson (October 5-6, 2010):42nd STGEC, Charleston, West Virginia

Tim Siegel (October 29, 2010): Deep Foundation Design - Axial Capacity, Settlement, and Lateral Resistance, Norfolk, Virginia

Tim Siegel (December 16, 2010): Shallow Foundation Design, Atlanta, Georgia

Steve Dapp (January 11, 2011): 2011 Louisiana Transportation Conference, Baton Rouge, Louisiana

Conferences, Meetings, Seminars, Workshops

kcICON Moving Forward – Test Shaft Installation

DSCN2673_s.jpg

I have been slow in posting on the progress of our part in the kcICON project (see here for background and here for latest project images by MoDOT). The exploratory drilling went very well with a short pause due to ice in the river in late January. The crews from Terracon did an outstanding job getting the borings completed, overcoming the occasional problems with drilling tools deciding they did not want to come out of the hole.

DSCN0528_s.jpg

Design work by Parsons on the main bridge proceeded (and is still ongoing) through the rest of winter and into the spring. In late April, PCC installed the test shaft in the middle of the pylon foundation with a 6-foot diameter rock socket 20 feet long. The shaft was tested using a group of 3 O-cells placed near the bottom of the shaft. The test yielded excellent results in both side shear and end bearing in the shale socket. Look for us to include the results in a future technical paper or journal article.

Design is continuing with the pylon shafts anticipated to be started in early July. The abutments and approach piers are schedule to be started later this summer or early fall.

The slide show embedded below has some photos of the exploratory drilling and the test shaft installation. Enjoy!


Technorati : , , , , , , ,

Comments are closed.

Archives

GeotechSearch.com

DBA Photo Albums

Artistic Construction - Vol 1JJA Construction 2010
LPV-145 Test Piles 2009-2010DFI 2009
JJA Construction - Shaft 3W South Load Test - October 2009Huey P. Long Bridge Drilled Shafts - October 2009
JJA Construction - Pier 2W - September 2009 PhotosUniv Kansas Research - Lateral Load Test on Drilled Shafts
Huey P. Long Bridge, New Orleans - Test Shaft Construction - July 16-19, 2009GIWW West Closure Complex Test Piles June and July 2009
Garden State Parkway Mullica River Bridge - Test Shaft Construction - June 2009JJA Construction - Base Grouting and Other Construction - June 2009
JJA Construction - Shaft Excavation, PIle Driving, and Cofferdams - May 2009JJA Construction - East Pier and East High Approach - April 2009
KcICON River Bridge - Bent 1, Bent 5, and Pylon - March 2009JJA Construction - West Pier and West High Approach Shafts - April 2009