Get the New FHWA Drilled Shaft Manual

Get the NCHRP Synthesis 418 – Pile Criteria From Test Pile Data

Dan’s Speaking Schedule

May 15-16, 2013: DFI Superpile 2013 Conference, Minneapolis, Minnesota

June 19-21, 2013: NHI Drilled Shaft Course, New Hampshire Department of Transportation, Concord, New Hampshire

July 11-12, 2013: Drilled Shafts for Major Bridge Projects, DFI-ADSC Drilled Shaft Seminar: Support with Confidence, Columbus, Ohio

Other DBA Team Speaking Appearances

Tim Siegel (May 16, 2013): Consideration of Overburden Effect on the Axial Resistance of CFA Piles Subjected to Loading Tests - DFI SuperPile 2013 - Minneapolis, Minnesota

Robert Thompson (June 5-7, 2013): NHI Driven Pile Foundation Inspection Course - Alabama Department of Transportation - Montgomery, Alabama

Robert Thompson (June 10-12, 2013): NHI Driven Pile Foundation Inspection Course - Alabama Department of Transportation - Grove Hill, Alabama

John Turner (June 19-21, 2013): NHI Drilled Shaft Course - New Hampshire Department of Transportation - Concord, New Hampshire

Conferences, Meetings, Seminars, Workshops

Mike Holloway SuperPile 2012 Presentation

DSCN2543We have added Mike Holloway’s presentation at DFI SuperPile 2012 on May 17, 2012 to our Presentations Page.  Mike discussed some of the issues related to pile testing and what can influence the blow counts that are often relied upon to accept piles.  He covered the types of testing, limitations of various methods, and issues to consider when applying test results to production piling.

A Driven Pile is a Tested Pile – Not So Fast! – D. Michael Holloway, Ph.D., P.E. – DFI SuperPile 2012, Portland, OR, May 17, 2012

Leave a Reply

  

  

  

You can use these HTML tags

<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

Archives

DBA Photo Albums

Foothills Parkway Bridge No. 2 - Completed Bridge and Live Load TestADSC Load Test Field Day
ADSC SE Drilled Shaft Research Project, Lawrenceville, GA Test SiteDBA Honors and Awards
JJA Pictures from Chris Ursery (FIGG)Foothills Parkway Bridge No. 2 - From a Birds Eye View
Hastings Bridge ConstructionFoothills Parkway Bridge No. 2
Ownesboro Hospital Ground ImprovementArtistic Construction - Vol 1
JJA Construction 2010LPV-145 Test Piles 2009-2010
DFI 2009JJA Construction - Shaft 3W South Load Test - October 2009
Huey P. Long Bridge Drilled Shafts - October 2009JJA Construction - Pier 2W - September 2009 Photos