Get the New FHWA Drilled Shaft Manual

Get the NCHRP Synthesis 418 – Pile Criteria From Test Pile Data

Dan’s Speaking Schedule

May 15-16, 2013: DFI Superpile 2013 Conference, Minneapolis, Minnesota

June 19-21, 2013: NHI Drilled Shaft Course, New Hampshire Department of Transportation, Concord, New Hampshire

July 11-12, 2013: Drilled Shafts for Major Bridge Projects, DFI-ADSC Drilled Shaft Seminar: Support with Confidence, Columbus, Ohio

Other DBA Team Speaking Appearances

Tim Siegel (May 16, 2013): Consideration of Overburden Effect on the Axial Resistance of CFA Piles Subjected to Loading Tests - DFI SuperPile 2013 - Minneapolis, Minnesota

Robert Thompson (June 5-7, 2013): NHI Driven Pile Foundation Inspection Course - Alabama Department of Transportation - Montgomery, Alabama

Robert Thompson (June 10-12, 2013): NHI Driven Pile Foundation Inspection Course - Alabama Department of Transportation - Grove Hill, Alabama

John Turner (June 19-21, 2013): NHI Drilled Shaft Course - New Hampshire Department of Transportation - Concord, New Hampshire

Conferences, Meetings, Seminars, Workshops

I-70 Mississippi River Bridge–News and Webcams!

2012-01-05mrbtowers-jan12-10

The new I-70 Mississippi River Bridge in St. Louis, Missouri is moving along and getting noticed in the news.  Here are a couple of (somewhat) recent articles:

The Republic (Columbus, Indiana) (01/29/2012)

St. Louis Business Journal (01/10/2012)

KMOX CBS (12/28/2011)

The New Mississippi River Bridge Project page maintained by MoDOT has links to all that is happening on the project.

You can get real-time updates of the construction from three web-cams at this link.  As I type today, the site is covered in snow.  Very beautiful, unless you are trying to build a bridge on time!

The project page also has photo galleries and other neat stuff.

stltoday.com has some albums with good photos, including this one.

Previous posts on this bridge project are here, including the world record O-Cell test!

Photo Credit: MoDOT (http://www.newriverbridge.org/img/galleries/year2012/010612/2012-01-05mrbtowers-jan12-10.JPG)

Leave a Reply

  

  

  

You can use these HTML tags

<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

Archives

DBA Photo Albums

Foothills Parkway Bridge No. 2 - Completed Bridge and Live Load TestADSC Load Test Field Day
ADSC SE Drilled Shaft Research Project, Lawrenceville, GA Test SiteDBA Honors and Awards
JJA Pictures from Chris Ursery (FIGG)Foothills Parkway Bridge No. 2 - From a Birds Eye View
Hastings Bridge ConstructionFoothills Parkway Bridge No. 2
Ownesboro Hospital Ground ImprovementArtistic Construction - Vol 1
JJA Construction 2010LPV-145 Test Piles 2009-2010
DFI 2009JJA Construction - Shaft 3W South Load Test - October 2009
Huey P. Long Bridge Drilled Shafts - October 2009JJA Construction - Pier 2W - September 2009 Photos